Finance Committee - Agenda - 2/17/2021 - P32
City of Nashua, NH
MS4 Assistance 2021-2022
Scope of Work for Engineering Services
6. BMP Potential Retrofit Inventory
City of Nashua, NH
MS4 Assistance 2021-2022
Scope of Work for Engineering Services
6. BMP Potential Retrofit Inventory
City of Nashua, NH
MS4 Assistance 2021-2022
Scope of Work for Engineering Services
City of Nashua, NH
MS4 Assistance 2021-2022
Scope of Work for Engineering Services
e employee training for handling these products
e Spill Prevention Plans, if applicable
e Procedures for dumpsters and other waste management equipment.
e Routine sweeping of parking lots
Vehicles and equipment: Establish procedures to include:
e vehicle storage to prevent leaks from entering the MS4
e minimizing exposure of fueling areas
e procedures to ensure that vehicle wash waters are not discharged to the MS4 or surface waters
January 21, 2021 EXHIBIT B
City of Nashua, NH
MS4 Assistance 2021-2022
Scope of Work for Engineering Services
This document sets out the scope of services to assist in maintaining Nashua’s compliance with the 2017 New
Hampshire Phase II Small MS4 General Permit (the Permit) through December 31, 2022. These services are
outlined below.
Scope
32.
terms or conditions of the contract shall be valid unless reduced to writing and signed by both
parties.
CHOICE OF LAW AND VENUE This contract shall be governed exclusively by the laws of the
State of New Hampshire and any claim or action brought relating to this contract, the work
performed or contracted to be performed thereunder, or referable in anyway thereto shall be
brought in Hillsborough County (New Hampshire) Superior Court Souther Judicial District or in
the New Hampshire 9th Circuit Court—Nashua and not elsewhere
23.
24.
25.
26.
No books, reports, studies, photographs, negatives or other documents, data, drawings or other
materials including but not limited to those contained in media of any sort (e.g., electronic,
magnetic, digital) prepared by or supplied to Professional Engineer in the performance of its
obligations under this contract shall be the subject of any application for a copyright or patent by
or on behalf of Professional Engineer. The City of Nashua shall have the right to reproduce any
such materials.
18.
19.
20.
21.
22.
Report (Standard Form 334) within 30 days after the end of each fiscal quarter until the
end of the contract.
ENDORSEMENT Professional Engineer shall seal and/or stamp and sign professional documents
including drawings, plans, maps, reports, specifications, and other instruments of service prepared
by Professional Engineer or under its direction as required under the laws of the State of New
Hampshire.
16.
17.
all immigration and naturalization laws, and the Americans With Disabilities Act. Professional
Engineer shall, throughout the period services are to be performed under this contract, monitor for
any changes to the applicable laws, statutes, regulations, ordinances, orders, or requirements,
shall promptly notify the City of Nashua in writing of any changes to the same relating to or
affecting this contract, and shall submit detailed documentation of any effect of the change in
terms of both time and cost of performing the contract.
12.
13.
14.
15.
> If aggregate limits of less than $2,000,000 are imposed on bodily injury and
property damage, Professional Engineer must maintain umbrella liability insurance of at
least $1,000,000. All aggregates must be fully disclosed on the required certificate of
insurance.