Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 9/28/2020 - P177

Board Of Aldermen - Agenda - 9/28/2020 - P177

By dnadmin on Sun, 11/06/2022 - 23:00
Document Date
Fri, 09/25/2020 - 11:22
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Mon, 09/28/2020 - 00:00
Page Number
177
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__092820…

@ Vanasse Hangen Brustlin, Inc.

o a © Eats, Suse Sey
=? a J °e
= at $ we,
2 ee * 4 =.
E ~
SN g <>
1 *
Factory Sire - “eltage Ay. Sey
TO) ‘t ft ~ ‘e =,
oss = ‘ Ree
3 é tees 4
E
High Street + = tr ;
} 2 ey ee
{ Schobel Stree: = - " ee
6 =
W, Pearl Street = << a = he
—_ ra = = ==> } =| :
: L, Le E- 92 af
} —— Hosmer Ave = hn bald zZ =)
engin! oh Rooe ee Ee
t : Sone RoW nol
+ So _—-
2 Wortestar Siresi
Pheasant Street E a Sbwet a ne ages
7 { i srs 3 —_* g Foundry Sureet
Ho 4 — f
5 4 4 =
3 | } 5 {
"6

Beech Sire!

Walrut Slteet

Figure 20: Factory St/T: em ple St and East and West Pearl Street Reverse One-way Alternative

This conversion to reverse flow along the entire length of the Factory /Temple Streets
and West/East Pearl Streets would be relatively straight forward due to the existing
cross section. No modifications to the roadway width would be required. Only the
roadway striping would need to be modified to reflect the change in flow. However,
the traffic control at all of the intersections would need to be modified to reverse
conditions. Both traffic signals on Main Street would need to be modified including
signal head placement, phasing and timing. The many unsignalized intersections
would also need modification including Water Street, Walnut Street, Elm Street,
Spring Street, Cottage Street, Quincy Street Holmes Street Mason Street, White
Avenue, and South Street. These changes would be mostly confined to modifying

signage and striping.

Table 7 - Signalized Intersection Capacity Analysis Summary

Existing 1-Way Reverse 1-Way Alternative
v/c* Delay** LOS*** v/c Delay LOS
Main St. at Factory/Temple St. AM _ 0.38 16 B 0.55 16 B
PM 0.46 26 C 0.54 19 B
Main St. at East/West PearlSt. AM 0.50 21 C 0.37 16 B
PM 0.47 22 C 0.42 22 G
* Volume to Capacity Ratio.
** Delay in seconds per vehicle.
*** Level of Service.
an Chaphnee atid dom 37 Alternatives Evaluation

‘Circulation Study\reports\Final ReporfFinal
Report.docx

Page Image
Board Of Aldermen - Agenda - 9/28/2020 - P177

Footer menu

  • Contact