Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 9/28/2020 - P155

Board Of Aldermen - Agenda - 9/28/2020 - P155

By dnadmin on Sun, 11/06/2022 - 23:00
Document Date
Fri, 09/25/2020 - 11:22
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Mon, 09/28/2020 - 00:00
Page Number
155
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__092820…

Veh gto) Bedtom52700 00 Nasnis
Citeulaiion Studyireparts\Final ReportFinal
Rlapor.dack

LF

Vanasse Hangen Brusilin, Inc,

> Water Street/Park Street (LOS EB),
>» Factory Street/Temple Street (LOS D), and
>» East/West Pearl Street (LOS D).

Poor operating conditions are further reflected at the following Main Street
signalized intersections located just north of the study area:

>» Franklin Street /Canal Street (LOS E), and
» Library Hill, Amherst Street /Lowell Street/Concord Street (LOS E/F).

As shown in the Table 1, the above listed Main Street intersections are forecast to
improve by at least one level of service with the construction of the Broad Street
Parkway (which draws traffic away from Main Street as an optional north/south
arterial). A similar level of service improvement (by one level) is also forecast for
signalized intersections (i.e., Franklin Street /Canal Street and Library Hill to LOS D)
located outside the Downtown circulation study area.

Existing Conditions

Page Image
Board Of Aldermen - Agenda - 9/28/2020 - P155

Footer menu

  • Contact