is displays and Real-Time Monitoring
O° PPT CRM Tce ese Tienes) States &
SOLAR AT P ; a Monarch School of New England | Peak Power, 47.4 kWo
The New CGeonseiweneyt
CxNature yy (;) REVISION ENERGY
ONSOTVAncy
59.01 wp ar se
Last Update June 4, 2018, 9:15AM
System Performance
Power and Energy
Wd.
2.5 kWh 161.2 kWh 21.65 MWh
samich |: 48,972 °
FENERATE it oy mn nes ‘i
——a—— r ELECTRIC
160
SOLAR
PANELS
E/NCla NA ila LS Ola 1ST
Brentwood Solar Array
434 SOLAR PANELS
OFFSETS MUNICIPAL ELECTRIC LOAD
fe aS eg
Fy dee fe = Sa a
TT ee
ut BBA gest yale erate wutvide Une fire station offset
earieedinn af Ganda Sebieti! Raving .
Shxemereniog HRs qeact tes rceer ate 18S JOO bilowatt}
Rremtapened oy ctach an $4 oviiavt ower the lite of the ppstern yetele
ANNUALLY, OOR ARRAY OFFSETS.
é) m 175,879 oe
~ zak
(Q) REVISION ENERGY
