Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 2/17/2021 - P141

Finance Committee - Agenda - 2/17/2021 - P141

By dnadmin on Mon, 11/07/2022 - 13:47
Document Date
Fri, 02/12/2021 - 11:32
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/17/2021 - 00:00
Page Number
141
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__021720…

sp

®)

CRANE AND HOIST wm
CRANE BUILDERS, INSTALLERS AND TECHNICIANS

December 28, 2020 Quote # 31760
City of Nashua Purchasing Department

229 Main Street, City Hall

Nashua, NH 03061-2019

Attention: Kelley Parkinson,
Re: Dry Well Hoist; Contract ID # IFB1093-122920

Dear Kelley,
We have put together the following proposal for your review. Specifications follow:
3-Ton Capacity Dry Well Hoist and Bridge Crane Motorization w/ Optional Laser Zoning

> (1) 3-ton capacity wire rope hoist to be installed on existing Cleveland Tramrail bridge crane.
Note: Removal of existing hoist included. Acco Hoist Model # C1W03D041-15M2D0, 460/3/60

> Available hoist lift = 45’.

>» Hoist speed = single speed, 15 FPM.

> Trolley speed = single speed, 33 FPM.

>» (2) Tractor drives to be mounted on existing bridge. Saturn Tractor Drives Model # T-144

> Bridge speed = 35/12 FPM, VFD control.

> Complete stainless steel c-track cross-bridge festoon system approx. 25’.

> 8-button hoist mounted push button control.

> Installation included.

> Disconnect and power to crane by others.

> Crane start-up and operational testing included.

> Load test included. (Load test of 125% of rated capacity as outlined in ANS! standards B30.16
and B30.17.) Load test documentation to be provided.

¢ Total cost for Material, installation, and Testing..........$47,280.00

¢ Optional Laser Zoning system, Laser View Crane Sentry Zone Manager, including installation and
testing........... add $9,569.00

Pricestesstaxes 5 stated in the Invitation for Bids, issued December 8, 2020, the City is exempt of all taxes.

Delivery: 18 weeks after approved drawings (approval drawings take approximately 4-6 weeks)
40% Down, 25% Before Shipment, Balance Net 30 Days (based on credit approval)

As stated in the Invitation for Bids, issued December 8, 2020, all bids are binding for ninety (90) d
Credit card orders will add 6% to the sale price following the deadline for bids, or until the effective date of any binding
Permits if required will be an additional cost resulting contract, whichever is later.

eee ¢ ¢

Notes/Clarifications:

¢ All painting will be standard oil-based paint for Mass Crane built structural steel systems unless otherwise

§00-1 Potash Hill Road, Tyngsboro, MA 01879 « TELEPHONE 800-909-2299 « www.masscrane.com 1

Page Image
Finance Committee - Agenda - 2/17/2021 - P141

Footer menu

  • Contact