Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 2/17/2021 - P58

Finance Committee - Agenda - 2/17/2021 - P58

By dnadmin on Mon, 11/07/2022 - 13:47
Document Date
Fri, 02/12/2021 - 11:32
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/17/2021 - 00:00
Page Number
58
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__021720…

§ 190-215 § 190-215

(2)

(3)

(4)

(l) The service, repainting, and hull maintenance areas of
marinas.

The following measures are required in addition to BMPs
described in Subsection E(1) above, within areas with high
potential pollutant loads:

(a) Source reduction; and
(b) Pretreatment.

The following are prohibited within areas with high potential
pollutant loads located in a Conservation Zone:

(a) Infiltration trenches;
(b) Infiltration basins; or
(c) Dry wells.

The following restrictions apply to certain BMPs within areas
of high potential pollutant loads: Sand or organic filters,
detention basins, wet ponds or constructed wetlands may be
used only if sealed or lined.

F. Wetland or water bodies.

(1)

(2)

BMPs approved for use within 300 feet of a wetland or water
body unless otherwise prohibited by § 190-24 are limited to:

(a) Extended detention basins;
(b) Wet ponds;

(c) Constructed wetlands;

(d) Water quality swales;

(e) Sand filters;

() Organic filters;

(g) Infiltration basins;

(h) Infiltration trenches; and

(i) Deep sump and hooded catch basins (used with other
BMPs).

Stormwater management systems should incorporate designs
which allow for shutdown and containment in the event of an
emergency spill or other unexpected contamination event.

4

23

Hic it Discharge Detection and Eimination Plan

23

Page Image
Finance Committee - Agenda - 2/17/2021 - P58

Footer menu

  • Contact