Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/6/2018 - P56

Finance Committee - Agenda - 6/6/2018 - P56

By dnadmin on Mon, 11/07/2022 - 11:36
Document Date
Wed, 06/06/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/06/2018 - 00:00
Page Number
56
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060620…

3/15/2018

@®

a A
SOLUTIONS

TL ET TTA LETT TURE LTT UL CU cn vee reresrere lees TLL TEL

oe Ne | Brea ae |

sn ety ek

Install and terminate all network cables between site routers and network
demarcation points, including micrewave, leased lines, and Ethernet.

8

Ensure that Type 1 and Type 2 AC suppression is installed to protect installed
equipment.

Q

Connect installed equipment to the provided ground system.
Label equipment, racks, and cables.

Perform preliminary audit of installed equipment to ensure compliance with
requirements and R56 standards.

Note any required changes to the installation for inclusion in the “as-built”
system documentation.

Q90
QO O000 0

Q &

Deliverable: Equipment installed.
Antenna transmissicn Line Installation
Install antennas, including supplying and installing new side arm mounts
Install towertop amplifiers.
Install transmission lines required for system.

Provide structure penetrations for transmission equipment (e.g. antennas or
microwave line.).

Perform sweep tests on transmission lines.

Provide and install attachment hardware for supporting transmission lines
on antenna support structure.

888s VsVgg
O00a 000

Deliverable: Antennas installed and grounded.
Console Installation.and Configuration

Identify circuits for connection to console and a demarcation point located
within 25 feet of the console interface.

8

Connect console to circuit demarcation points.

SS)

Install PC workstation w/ keyboard and mouse, and monitor.

Install a Voice Processor Madule (VPM) and purchased peripheral console
equipment in accordance with R56 standards and state/local codes.

Develop templates for console programming.

Qe 8
OO000 0

Perform console programming and configuration.
Deliverable: Console equipment installation completed.
Eentrol Station Installation-and Configuration

Provide the locations of control stations and desk sets at each site.

YO
O®8

Survey mounting locations and develop control station instaliation plan.

Provide adequate space, grounding, and power for the control station
installation.

8

Properly connectorize and ground the cabling, which will be run to the
outdoor antenna location using the least obtrusive method.

POR EERE EE ENTE EEE EL PETE EET OR Re ee OTP RRR EEOP EL T RETEST OTT TEETER TERETE TITER ETE

© O
O

Use or disclosure of this proposal is subject
to the restrictions on the disclosure page.

ee

Page #1

Page Image
Finance Committee - Agenda - 6/6/2018 - P56

Footer menu

  • Contact