Additional Costs
Besides the “basic” services fee the following “additional” services costs need to be included
in the City’s TTG final engineering design services budget. These costs are considered
“allowances” because either their scope is yet to be finally determined, or the amount of
the service {i.e., number of progress meetings) has been determined.
Item Allowance
A.1 - Geotechnical Analyses & Recommendations ................::cccesereee 5 75,000.00
A.2 — Spot Field Surveys ........cccccccscscseecnsseressserseeseseneesevescensecessseseaseneenss $ 12,000.00
A.3 — Project Progress Meetings .........csccsssecesetccscetssneseerteetceseseneaaens 5 16,000.00
B.4— CM Coordination ......csccsecccssccssscecnsersececsseesneaersseenteseeseversasesesevees $ 15,000.00
TOTAL jsateeraeree 118,000.00