Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 5/24/2022 - P175

Board Of Aldermen - Agenda - 5/24/2022 - P175

By dnadmin on Mon, 11/07/2022 - 07:43
Document Date
Thu, 05/19/2022 - 14:38
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 05/24/2022 - 00:00
Page Number
175
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__052420…

Customer Responsibilities

Provide timely access to plant for Milton CAT employees

Receive part deliveries ahead of services if necessary and stage in generator room
Maintain jacket water and cooling pumps

Maintain cooling system

Perform oil samples every 100 hours

Maintain coolant additives - as needed

Drain skid condensate bowls - daily

Controi Panel - inspect/Test - daily

Coolant Level - Check - daily
Electrical Connections — Check - daily
Engine Air Cleaner Service indicator - Inspect - daily
Engine Air Pre-cleaner - Check/Clean - daily
. Engine Oit Level - Check - daily
Fuel Filter Differential Pressure - Check - daily
Generator - Inspect - daily
Generator Load - Check - daily
Power Factor - Check - daily
Voltage and Frequency — Check - daily
Watk-Around Inspection - daily

YPNOVOZ ET KR KT Tam sop >S

Excluded Services

The following services are not included under this Agreement, and if provided, will result in
additional charges to Customer. MCAT is not obligated te perform excluded services, unless the
parties arrange for such services under a separate agreement.

A. Pipework repairs from the flange on the engine

B. Maintenance and testing synchronizing breakers, switchgear & electrical distribution
system

C. Site modifications or changes if unit needs to be repaired off-site

D. Regulatory permitting of any kind

E. Crane/rigging required to remove unit or components for repair if onsite trolley and service
elevator cannot accommodate or doesn’t exist. MCAT accepts no responsibility for collateral
damage, other than that described in the penalty clause.

F. All Services outside of the “scope of work” (these will be quoted at T&M rates if required)

G. EPA or DEP emissions testing

H. Plant water\treatment \coolant replacement

I. Any additional cost of repairs or maintenance required as a result of misuse, alteration or
interference with the Maintained Equipment by any party other than MCAT or MCAT
subcontractor

Page Image
Board Of Aldermen - Agenda - 5/24/2022 - P175

Footer menu

  • Contact