Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 5/24/2022 - P173

Board Of Aldermen - Agenda - 5/24/2022 - P173

By dnadmin on Mon, 11/07/2022 - 07:43
Document Date
Thu, 05/19/2022 - 14:38
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 05/24/2022 - 00:00
Page Number
173
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__052420…

Starting System:
® Check and record specific gravity reading of each battery cell
(if maintainable).
* Check for proper level of electrolyte in each cell.
® Check battery charger for proper operation and record amperage reading.
® Check and record the jast date that batteries were replaced. Recommend that
batteries be replaced every three years, regardless of condition.

Control Panel:
« Verify gauges are operating and record readings.
* Check for presence of any warning lights/alarms.
* Perform lamp/bulb test.
Safety Controls - check for proper operation of safety devices:
« Overcrank
* Overspeed
¢ High Coolant Temperature
* Low Oil Pressure
* Not-in-Auto
© Emergency Stop
Fuel system:
¢ Inspect engine gas lines, regulator and carburetor for signs of leaks/corrosion.
¢ Inspect throttle and mixture valves and linkage (if equipped) for proper operation.
¢ inspect ignition system (magneto/distributor/spark plugs/wires).
Operational Checks with Engine Running:
* Check for any leaks or unusual noises.
*« Verify proper voltage and frequency via control panel gauges.
e Check for proper air inlet.
* Operate for no more than five (5) minutes without load.
¢ Perform five (5) minute full generator output test. Customer representative must be
present to operate necessary circuit breaker to allow transfer to emergency source.

Walk-around inspection:
* Visual inspection of generator and environment.
¢ Check for signs of rodent/insect activity.
Conclusion of visit / Recommendations:
« Control panel: confirm control switch is in “aute” position.
* Circuit breaker: confirm genset is in run status
* Provide written recommendation(s) for any suggested repairs.
e Make electronic copy of inspection report available to customer.
* Provide written estimate of additional work to customer within one week of service
visit.
* Technician will clean up and dispose of any waste

Page Image
Board Of Aldermen - Agenda - 5/24/2022 - P173

Footer menu

  • Contact