Document Date
Meeting Description
Document Type
Meeting Date
Page Number
29
Ww
a
¢
fa)
a
=}
a
Oo
Ww
a
le}
[ag
a
o)
2
od
¢
a
[ag
¢
Ww
a
a
a
=}
=
Paving History
In the years prior to 2017, the City paved 6 to 8
miles annually.
The City embarked on a $75 Million, 10 year
paving plan. The first half of the program was
funded (R-17-092).
The first 5 years resurfaced ~113 miles of
roadways
Average PCI increased from 67.5 to 78.4
Legend
same PavingProgram_2021
ae Paving History 2016 -2020
= y AT = =
a A 7) a
cA 45S \
oe pit Aneel pee, (e) OpenStreetfftap contributors. and’ nth }
Page Image
