Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 8/11/2020 - P85

Board Of Aldermen - Agenda - 8/11/2020 - P85

By dnadmin on Sun, 11/06/2022 - 23:05
Document Date
Fri, 08/07/2020 - 15:09
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/11/2020 - 00:00
Page Number
85
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__081120…

at
\ ;
i

vnb Dasign Services & Project Management of Downtown Riverfront implementation
October 31, 2019

1.4.9 - Multipurpose Trail

This subarea includes updates to the existing trail thet may include: reconstruction and
repaving of the trail if necessary or desired, pedestrian lighting, trail furn ishings, smal)
plazas for overlooks, and selected locations for public art. This may also include screening
of the power substation. VHB will rely on information from HL Turner related to floodplain
elevations and restrictions and will likely avoid adding fill as part of any trail enhancements
if possible,

VHB will also examine potential landscape enhancements along the river's edge to
enhance aesthetics and control invasives.

Product: Plans, typical crass sections, sketches and one (1) perspective as appropriate to
define the proposed improvemenis.

Lead Consultant: VHB
Support from: Halvorson, HL Turner, Lumen Design Studio, Fitzemeyer & Tocci

1.4.10 - New Floating Dock + Access Ramp.

This area will incluce the assessment and conceptual design of a new pedestrian ramp and
floating dock to provide improved river access. The ramp and dock are envisioned to be
floating to avoid concerns with filling within the floodway, and removable to prevent
winter damage. HL Turner will conduct early due diligence to determine the configuration
and feasibility of this structure.

Product; Plans, sections and sketches as appropriate to define the proposed improvements.

Lead Consultant HE Turner
Support from: VHB, Halverson

1.4.11 - Existing Trail Improvements

This sub area may include updates to the existing trail that would include: reconstrucéion
and repaving of the trail where appropriate or necessary, lighting, trail furnishings, small
plazas for overlooks or pause places, and selected locations for public art. This area may be
explored for potential flood storage in upland areas if flood mitigation is needed due to
proposed filling elsewhere.

Product; Plans, typical cross sections, sketches and one (1) perspective as appropriate to
define the proposed improvements.

Page Image
Board Of Aldermen - Agenda - 8/11/2020 - P85

Footer menu

  • Contact