Finance Committee - Agenda - 3/6/2019 - P103
Work in connection therewith (except in an emergency as required by paragraph 6.16.A), notify OWNER and
ENGINEER in writing about such condition. CONTRACTOR shall not further disturb such condition or perform
any Work in connection therewith (except as aforesaid) until receipt of written order to do so.
B. ENGINEER’s Review: After receipt of written notice as required by paragraph 4.03.A, ENGINEER will
promptly review the pertinent condition, determine the necessity of OWNER’s obtaining additional exploration or tests