Technical Specifications FY2019 Paving Program
ITEM 604.4 - REPAIR OF EXISTING STRUCTURES
A. SCOPE

This work consists of repairing existing structures below 12” from the bottom of existing casting
frame.

B. MATERIALS AND CONSTRUCTION

The contractor shall include all labor, materials, equipment, and transportation necessary to
repair existing structures other than within the top 12 inches below the bottom of casting frame.
Repairs in that section shall not be paid under this item.

Finance Committee - Agenda - 3/6/2019 - P172

By dnadmin on Mon, 11/07/2022 - 13:10
  • Read more about Finance Committee - Agenda - 3/6/2019 - P172

Technical Specifications FY2019 Paving Program

Contractor shall record the square yards of cold planed area for each street. Payment is
contingent upon submittal of quantities in a per street format.

This item will be measured by the Square Yard. Payment for this item shall be at the contract

unit price per Square Yard. This payment shall also include all materials, labor, equipment, and
all else needed to complete the work under this item.

il

Finance Committee - Agenda - 3/6/2019 - P171

By dnadmin on Mon, 11/07/2022 - 13:10
  • Read more about Finance Committee - Agenda - 3/6/2019 - P171

Technical Specifications FY2019 Paving Program

ITEM 417.20- COLD PLANING TRANSITIONS
A. SCOPE

This work shall consist of the removal of existing bituminous pavement the depth and limits
shown on the plans or as directed by the Engineer. Cold planning transitions are required to tie in
overlays with existing pavement.

For roadways which are being reclaimed this item shall only be used to pay for cold planing at
driveway tie-ins as directed by the Engineer.

Finance Committee - Agenda - 3/6/2019 - P170

By dnadmin on Mon, 11/07/2022 - 13:10
  • Read more about Finance Committee - Agenda - 3/6/2019 - P170

Technical Specifications FY2019 Paving Program

ITEM 417 - COLD PLANING OF BITUMINOUS SURFACES
A. SCOPE

This work shall consist of the removal of existing bituminous pavement between road edges, to
the depth shown on the plans or as ordered by the Engineer. Maximum depth will vary from 2.0”
to 3.5”, depending upon the type of the street.

B. MATERIALS AND CONSTRUCTION

Finance Committee - Agenda - 3/6/2019 - P169

By dnadmin on Mon, 11/07/2022 - 13:10
  • Read more about Finance Committee - Agenda - 3/6/2019 - P169

Technical Specifications FY2019 Paving Program

ITEM 403.12 - HOT BITUMINOUS PAVEMENT, HAND METHOD
A. SCOPE

This work shall include paving using the hand method for driveways, curb patches, areas
between railroad crossings, areas where it is impractical to pave using machine method, as
shown on the plans, or as ordered by the Engineer. Hand method paving shall not be used where
machine method (Item 403.11) paving is required.

B. MATERIALS AND CONSTRUCTION

Finance Committee - Agenda - 3/6/2019 - P168

By dnadmin on Mon, 11/07/2022 - 13:10
  • Read more about Finance Committee - Agenda - 3/6/2019 - P168

Technical Specifications FY2019 Paving Program

Cores shall be 6” in diameter and cut to the subbase. After core has been cut, contractor shall
thoroughly remove all water in the core hole, tack sides of core hole, fill hole with hot mix
asphalt, and compact until required densities are achieved. Contractor shall provide ice to cool
mix when ambient temperatures are high.

Finance Committee - Agenda - 3/6/2019 - P167

By dnadmin on Mon, 11/07/2022 - 13:10
  • Read more about Finance Committee - Agenda - 3/6/2019 - P167

Technical Specifications FY2019 Paving Program

ITEM 403.11 - HOT BITUMINOUS PAVEMENT (METHOD
SPECIFICATION), MACHINE METHOD

ITEM 403.119 - HOT BITUMINOUS PAVEMENT (METHOD
SPECIFICATION), MACHINE METHOD, HIGH STRENGTH

A. SCOPE

This work shall consist of furnishing and placing bituminous pavement including shim pavement
to the depth shown on the plans or ordered by the Engineer. Work shall also include obtaining
asphalt samples on behalf of the City for quality control testing.

B. MATERIALS AND CONSTRUCTION

Finance Committee - Agenda - 3/6/2019 - P166

By dnadmin on Mon, 11/07/2022 - 13:10
  • Read more about Finance Committee - Agenda - 3/6/2019 - P166

Technical Specifications FY2019 Paving Program

ITEM 403.6 - PAVEMENT JOINT ADHESIVE
A. SCOPE

This work includes the installation of pavement joint adhesive in locations shown on the plans or
ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

Finance Committee - Agenda - 3/6/2019 - P165

By dnadmin on Mon, 11/07/2022 - 13:10
  • Read more about Finance Committee - Agenda - 3/6/2019 - P165

Technical Specifications FY2019 Paving Program

ITEM 304.33 - CRUSHED AGGREGATE FOR SHOULDERS
A. SCOPE

This work shall consist of furnishing and placing crushed aggregate to raise the edge of the
roadway shoulders as shown on plans or directed by the Engineer.

B. MATERIALS AND CONSTRUCTION

Finance Committee - Agenda - 3/6/2019 - P164

By dnadmin on Mon, 11/07/2022 - 13:10
  • Read more about Finance Committee - Agenda - 3/6/2019 - P164

Technical Specifications FY2019 Paving Program

ITEM 306.114 — RECLAIMED STABILIZED BASE PROCESSED IN
PLACE, 14” DEEP (F)

A. SCOPE