liabilities, interest, attorneys' fees, costs and expenses of any kind or nature in any manner caused, occasioned, or
contributed to in whole or in part by reason of any negligent act, omission, or fault or willful misconduct, whether
active or passive, of Contractor or of anyone acting under its direction or control or on its behalf in connection with or
incidental to the performance of this contract. Contractor's indemnity, defense and hold harmless obligations, or

Finance Committee - Agenda - 3/6/2019 - P302

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P302

incorporated in or accompanying the Shop Drawing or Sample approval; nor will any approval by ENGINEER
relieve CONTRACTOR from responsibility for complying with the requirements of paragraph 6.17.D.1.

F. Resubmittal Procedures

Finance Committee - Agenda - 3/6/2019 - P301

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P301

Supplier, pertinent data such as catalog numbers, and the use for which intended and otherwise as ENGINEER may
require to enable ENGINEER to review the submittal for the limited purposes required by paragraph 6.17.E. The
numbers of each Sample to be submitted will be as specified in the Specifications.

C. Where a Shop Drawing or Sample is required by the Contract Documents or the schedule of Shop Drawings and
Sample submittals acceptable to ENGINEER as required by paragraph 2.07, any related Work performed prior to

Finance Committee - Agenda - 3/6/2019 - P300

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P300

D. Power Lines: No equipment of any kind shall be used or permitted within such proximity to the conductors of the
Public Services of New Hampshire power lines as to be in violation of the safe working clearance prescribed by the
National Electrical Safety Code.

Finance Committee - Agenda - 3/6/2019 - P299

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P299

4. Correct grade or alignment of roads, structures, or utilities if any changes were made from Contract Drawings.

5. Correct elevations if changes were made in site grading.

6. Changes in details or design or additional information obtained from working drawings specified to be prepared
or furnished by the CONTRACTOR including but not limited to fabrication, erection, installation plans and
placing details, pipe sizes, insulation material, dimensions or equipment foundations, etc.

Finance Committee - Agenda - 3/6/2019 - P298

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P298

During the progress of the Work CONTRACTOR shall keep the Site and other areas free from accumulations of
waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other
debris shall conform to applicable Laws and Regulations.

Cc. Cleaning:

Prior to Substantial Completion of the Work CONTRACTOR shall clean the Site and make it ready for utilization
by OWNER. At the completion of the Work CONTRACTOR shall remove from the Site all tools, appliances,

Finance Committee - Agenda - 3/6/2019 - P297

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P297

b. A description of the portion of the work or improvement which each subcontractor named in the bid
will complete.

2. The CONTRACTOR shall list in his bid the name of a subcontractor for each portion of the project that
will be completed by a subcontractor.

3. A CONTRACTOR whose bid is accepted shall not substitute any person for a subcontractor who is
named in the bid, unless:

a. The awarding authority objects to the subcontractor, requests in writing a change in the
subcontractor and pays any increase in costs resulting from the change; or

Finance Committee - Agenda - 3/6/2019 - P296

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P296

E. If the Davis-Bacon Act applies, CONTRACTOR shall furnish to the OWNER within seven days after payment date
of the weekly payroll period, a statement of wages paid for each of the CONTRACTOR’s employees or a payroll
report. If the Davis-Bacon Act applies, CONTRACTOR shall furnish to the OWNER within seven days after payment
date of the weekly payroll period, a statement of wages paid for each of any subcontractor's employees or a payroll
report for each subcontractor. The statement or report must include the CONTRACTOR’s certification of compliance

Finance Committee - Agenda - 3/6/2019 - P295

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P295

6.07 Patent Fees and Royalties

Finance Committee - Agenda - 3/6/2019 - P294

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P294

F. CONTRACTOR's Expense: CONTRACTOR shall provide all data in support of any proposed substitute or “or-
equal” at CONTRACTOR’s expense.

6.06 Concerning Subcontractors, Suppliers, and Others