Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 3/6/2019 - P513

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P513

Supplier, pertinent data such as catalog numbers, and the use for which intended and otherwise as ENGINEER may
require to enable ENGINEER to review the submittal for the limited purposes required by paragraph 6.17.E. The
numbers of each Sample to be submitted will be as specified in the Specifications.

C. Where a Shop Drawing or Sample is required by the Contract Documents or the schedule of Shop Drawings and
Sample submittals acceptable to ENGINEER as required by paragraph 2.07, any related Work performed prior to

Finance Committee - Agenda - 3/6/2019 - P512

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P512

D. Power Lines: No equipment of any kind shall be used or permitted within such proximity to the conductors of the
Public Services of New Hampshire power lines as to be in violation of the safe working clearance prescribed by the
National Electrical Safety Code.

Finance Committee - Agenda - 3/6/2019 - P511

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P511

4. Correct grade or alignment of roads, structures, or utilities if any changes were made from Contract Drawings.

5. Correct elevations if changes were made in site grading.

6. Changes in details or design or additional information obtained from working drawings specified to be prepared
or furnished by the CONTRACTOR including but not limited to fabrication, erection, installation plans and
placing details, pipe sizes, insulation material, dimensions or equipment foundations, etc.

Finance Committee - Agenda - 3/6/2019 - P510

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P510

During the progress of the Work CONTRACTOR shall keep the Site and other areas free from accumulations of
waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other
debris shall conform to applicable Laws and Regulations.

Cc. Cleaning:

Prior to Substantial Completion of the Work CONTRACTOR shall clean the Site and make it ready for utilization
by OWNER. At the completion of the Work CONTRACTOR shall remove from the Site all tools, appliances,

Finance Committee - Agenda - 3/6/2019 - P509

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P509

b. A description of the portion of the work or improvement which each subcontractor named in the bid
will complete.

2. The CONTRACTOR shall list in his bid the name of a subcontractor for each portion of the project that
will be completed by a subcontractor.

3. A CONTRACTOR whose bid is accepted shall not substitute any person for a subcontractor who is
named in the bid, unless:

a. The awarding authority objects to the subcontractor, requests in writing a change in the
subcontractor and pays any increase in costs resulting from the change; or

Finance Committee - Agenda - 3/6/2019 - P508

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P508

E. If the Davis-Bacon Act applies, CONTRACTOR shall furnish to the OWNER within seven days after payment date
of the weekly payroll period, a statement of wages paid for each of the CONTRACTOR’s employees or a payroll
report. If the Davis-Bacon Act applies, CONTRACTOR shall furnish to the OWNER within seven days after payment
date of the weekly payroll period, a statement of wages paid for each of any subcontractor's employees or a payroll
report for each subcontractor. The statement or report must include the CONTRACTOR’ certification of compliance

Finance Committee - Agenda - 3/6/2019 - P507

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P507

6.07 Patent Fees and Royalties

A. CONTRACTOR shall pay all license fees and royalties and assume all costs incident to the use in the performance
of the Work or the incorporation in the Work of any invention, design, process, product, or device which is the subject
of patent rights or copyrights held by others. If a particular invention, design, process, product, or device is specified
in the Contract Documents for use in the performance of the Work and if to the actual knowledge of OWNER or

Finance Committee - Agenda - 3/6/2019 - P506

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P506

F. CONTRACTOR's Expense: CONTRACTOR shall provide all data in support of any proposed substitute or “or-
equal” at CONTRACTOR’s expense.

6.06 Concerning Subcontractors, Suppliers, and Others

Finance Committee - Agenda - 3/6/2019 - P505

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P505

b. CONTRACTOR certifies that: (i) there is no increase in cost to the OWNER; and (ii) it will conform
substantially, even with deviations, to the detailed requirements of the item named in the Contract Documents.

2. Substitute Items

a. If in ENGINEER’s sole discretion an item of material or equipment proposed by CONTRACTOR does
not qualify as an “or-equal” item under paragraph 6.05.A.1, it will be considered a proposed substitute item.

Finance Committee - Agenda - 3/6/2019 - P504

By dnadmin on Mon, 11/07/2022 - 13:11
  • Read more about Finance Committee - Agenda - 3/6/2019 - P504

Concord Street Somerset Parkway
Daniel Webster Highway Spitbrook Road
East Dunstable Road West Hollis Street

6.03 Services, Materials, and Equipment

Pagination

  • Previous page ‹‹
  • Page 723
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact