Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 10/7/2020 - P56

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P56

Nashua South High School

ECM 1 - LED Lighting

The schools currently utilize a combination of T8 and T5 fluorescent lighting. EEI proposes
replacing the existing fixtures with new LED lighting. EEI performed a detailed survey of the
interior and exterior spaces in order to identify opportunities in which we can improve
lighting quality, reduce maintenance costs, and save energy.

Finance Committee - Agenda - 10/7/2020 - P55

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P55

ECM 7 — Condensing Hot Water

The current water heating units are standard efficiency. This measure would be to
replace the current system with high efficiency condensing Lochinvar units Armor Floor
Mounted units with 98% efficiency. The units have a 5:1 turndown with stainless steel
heat exchanger. Scope to include new ASME storage tanks, expansion tanks, and
circulation pumps.

ECM 8 - Targeted Balancing

Finance Committee - Agenda - 10/7/2020 - P54

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P54

Scope of work:

Inspect exterior doors for deficiencies to the weather stripping and door sweeps. Install
new weather stripping and door sweeps as needed.

ECM 4 - Transformers

Finance Committee - Agenda - 10/7/2020 - P53

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P53

Assumptions:
o Net Annual Interior LED Lighting kWh Savings = 820,956 kWh

o % of time HVAC Systemis Heating = 3000 hours / 8760 hours = 35%
o % of time HVAC Systemis Cooling = 3000 hours / 8760 hours = 35%
o Heating SystemEfficiency = 80%
o Cooling System Efficiency = .7 kW/ton
o Utility Rate per Therm = $1.00/therm
o Utility Rate per kWh = $.15/kWh

Scope of Work:

Install (2,953) LED 2x4 and 2x4 retrofit fixtures with Spacewise control and wireless
dimming capability

Finance Committee - Agenda - 10/7/2020 - P52

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P52

Energy Conservation Measures

In this section of the document we will define the Energy Conservation Measures we have
evaluated for this project. Then we will define the measures on a building by building basis.
Careful consideration was given to each measure and its interaction withthe overall building
performance.

General ECM Descriptions
Nashua North High School

ECM 1 - LED Lighting

Finance Committee - Agenda - 10/7/2020 - P51

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P51

Economic Analysis

Finance Committee - Agenda - 10/7/2020 - P50

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P50

Utility Analysis

Finance Committee - Agenda - 10/7/2020 - P49

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P49

ECM Matrix

ECM Matrix

Upgrade

ransformers

Commissioning

Hot Water
argeted Balancing
Hood
In Coolers
otal NNHS

Upgrade

ransformers

Commissioning

Hot Water

argeted Balancing

Hood
In Coolers
otal NSHS

Cost for Installed Energy Savings potential Rebates “wal Hectric
‘ a a La)

i Teteei tp -mey

Al?
$1,077,300
$50,000.
$577,371.
$262, 080.
700.
$165,000.
$75,000.
000.
$35,000.
$3690,868.

Finance Committee - Agenda - 10/7/2020 - P48

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P48

Executive Summary

EEI is located in Merrimack, NH, and has a proven track record of designing and
implementing energy improvements to mechanical systems, building controls systems,
insulation, and renewable systems. EEI is also an approved energy management contractor
with, Eversource, Liberty Utilities, and Unitilin New Hampshire.

EEI has developed a plan which could reduce annual energy expenditures in the
district by more than $466,719.70

Finance Committee - Agenda - 10/7/2020 - P47

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P47

Table of Contents

Executive SUM MALY vaccceseeeeeceseeeeeeeeseeeeeeueeaseeeueeeeeseueeeeeseuaeeausauaeeansanas

ECM Matrix wiccccccceeccceceeeceeeeeeeeeeenaeeeeeaeeeesaeeuneeneueuaneeueeaeeueeeeeeugeeeeueeaneegs

3
4
Utility AM@lySIS .....cccccseeceeeseecseeeseeceeaeaeueeeasaeaeeeagueeeesuaueeeuauaueeseanaeaeaesnsD
ECONOMIC ANALYSIS .icccccceceseceeeeeeeeeeeseeeaeeeeuaeaeaeeuaeaeaueeauaeaeaeanaeaeanaeersnssO

7

Energy Conservation Measures DEPP

Pagination

  • Previous page ‹‹
  • Page 595
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact