Finance Committee - Agenda - 10/7/2020 - P76

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P76

| oI

ENERGY EFFICIENT INVESTMENTS INC.

ceiling system. New units will be furnished with wind baffles for low ambient cooling and new wall
mounted thermostats

Furnish and install (1) York cooling only system, 3.5-ton cooling

Finance Committee - Agenda - 10/7/2020 - P75

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P75

| oI

ENERGY EFFICIENT INVESTMENTS INC.

heat output adds to the building cooling load.

EEI recommends the replacement of existing efficient transformers in order to improve the energy
efficiency of the electrical distribution systems through the replacement of the transformers with
new high efficiency units. The scope of work for this measure would include:

30 Transformers

(6) 15 kVA
(2) 45 kVA
(2) 75kVA
(8) 112.5 kVA
(3) 150 kVA
(5) 220 kVA
(1) 225 kVA
(2) 300 kVA
(1) 400 kVA

Finance Committee - Agenda - 10/7/2020 - P74

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P74

| oI

ENERGY EFFICIENT INVESTMENTS INC.

ECM 2- Controls Upgrade

EEI proposes installing a complete DDC system as an extension of the existing N4 Enterprise
Supervisor.

Scope of work:

Demo the existing VAV controllers, keeping the existing communication wiring operational for the
existing controllers. Install new BACnet IP DDC controllers, new space sensors, and new discharge air
sensors. Install network controller hardware and software updates as needed.

Finance Committee - Agenda - 10/7/2020 - P73

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P73

| oI

ENERGY EFFICIENT INVESTMENTS INC.

Nashua South High School

ECM 1- LED Lighting

The schools currently utilize a combination of T8 and TS fluorescent lighting. EEI proposes replacing the
existing fixtures with new LED lighting. EEI performed a detailed survey of the interior and exterior spaces
in order to identify opportunities in which we can improve lighting quality, reduce maintenance costs, and
save energy.

Finance Committee - Agenda - 10/7/2020 - P72

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P72

| oI

ENERGY EFFICIENT INVESTMENTS INC.

ECM 10- Walk In Coolers

Finance Committee - Agenda - 10/7/2020 - P71

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P71

| oI

ENERGY EFFICIENT INVESTMENTS INC.

ECM 6-—- Mini Splits
EEI proposes removing the (19) existing Mitsubishi ductless splits.

Finance Committee - Agenda - 10/7/2020 - P70

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P70

| oI

ENERGY EFFICIENT INVESTMENTS INC.

EEI recommends the replacement of existing efficient transformers in order to improve the energy
efficiency of the electrical distribution systems through the replacement of the transformers with
new high efficiency units. The scope of work for this measure would include upgrading:

32 Transformers

(5) ISKVA
(4) 30 kVA
(2) 45 kVA
(1) 75 kVA
(6) 112.5 kVA
(1) 145kVA
(1) 150kVA
(1) 175 kVA
(3) 220 kVA
(4) 225 kVA
(2) 300 kVA
(2) 500 kVA

Finance Committee - Agenda - 10/7/2020 - P69

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P69

| oI

ENERGY EFFICIENT INVESTMENTS INC.

EEI proposes installing a complete DDC system as an extension of the existing N4 Enterprise
Supervisor.

Scope of work:

Demo the existing VAV controllers, keeping the existing communication wiring operational for the
existing controllers. Install new BACnet IP DDC controllers, new space sensors, and new discharge air
sensors. Install network controller hardware and software updates as needed.

Finance Committee - Agenda - 10/7/2020 - P68

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P68

| oI

ENERGY EFFICIENT INVESTMENTS INC.

Nashua North High School

ECM 1- LED Lighting

The schools currently utilize a combination of T8 and TS fluorescent lighting. EEI proposes replacing the
existing fixtures with new LED lighting. EEI performed a detailed survey of the interior and exterior spaces
in order to identify opportunities in which we can improve lighting quality, reduce maintenance costs, and
save energy.

Finance Committee - Agenda - 10/7/2020 - P67

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P67

| oI

ENERGY EFFICIENT INVESTMENTS INC.

ECM: Nashua South High School

M&V Option Used

1. LED Lighting Option A
2. Controls Upgrade Option C
3. Weatherization Option C
4, Transformers Option B
5, Retro-Commissioning Option C
6. Mini Splits Option B
7, Condensing Hot Water Option A
8. Targeted Balancing Option A
9. Kitchen Hood Option B
10, Walk In Coolers Option B