Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 9/16/2020 - P63

By dnadmin on Mon, 11/07/2022 - 13:26
  • Read more about Finance Committee - Agenda - 9/16/2020 - P63

(Motor Vehicle Finish Scheduk Fuavanons ron nears ecacaierassaiea || TAR
Room #]Room Name ‘Atea (SF) | Perimeter oor Bose Walls Celing Hotes vous peeves On WL s wn
126|[CORRIDOR 366.49 a" = = ~ = PATCH AND PAINT AS NEEDED DC nD PUNTCLE ROMROSTWT CABMET eee 2
131/BREAK ROOM 138.81 (60-10 174" we aS NT ‘Ket souivonlenmoes ee'wmerous. || On
132| VAULT 248.89 _[éat" AS IS ASIS NT AS z Es
133] MANAGER. 15471149 ASIS ASIS MY ‘ACT oa
134A] Tax PUBLIC 95.38 [S22 WF MARMOLEUM RUBBER NT ‘ACT web

Finance Committee - Agenda - 9/16/2020 - P62

By dnadmin on Mon, 11/07/2022 - 13:26
  • Read more about Finance Committee - Agenda - 9/16/2020 - P62

229 Main St
Nashua » NH

Nashua City Hall Remodel
Health and security updates

Floor Plan - Assessing
SCALE: 1 = 10

"| Floor Plan - Assessing

er

|— DEMO WALL FOR NEW PrENIVG:

|
s

BIDSET2 8/17/2020

@
bese

fn is
9 ar + are,

_ Demo Plan - Motor Vehicle & Tax

\ A
? SCALE 1/8" = 1-0" 5 Hoor Plan = Assessing
———_— 1028" SCALE 10

Finance Committee - Agenda - 9/16/2020 - P61

By dnadmin on Mon, 11/07/2022 - 13:26
  • Read more about Finance Committee - Agenda - 9/16/2020 - P61

SCOPE OF WORK

MOTOR VEHICLE & TAX DIVISION (3, 2005f)
1

DEMOLITION OF SEVERAL WALLS, MLLWORK DOORS, PAEED PLATFORM IN MOTOR VEHICLE. CUT NEW DODR OPENING LOCATIONS,
DEMO EXSTING ACT CBUNG AND UGHTING.

2
COPSTRUCT NEW WALL, PATCH AND PAINT COMPLETE (INCLUDING VAULT)
3

DEMO AIR HANDLERS AND PROVIDE MEW VEF SYSTEM TIED INTO ENSTING DUCTWORT FOR MEW WALLLOCANIONS AND BALANCE =|
SYSTEM

4
PROVIDE NEW LED IGHIING IN NEW ACT CELING THROUGHOUT

Finance Committee - Agenda - 9/16/2020 - P60

By dnadmin on Mon, 11/07/2022 - 13:26
  • Read more about Finance Committee - Agenda - 9/16/2020 - P60

Finish Schedule - ASSESSING
Room # [Room Name ‘Area (SF) | Perimeter Hoor Base Walls Ceiling Notes
21|Comdor 505.48 [122-1 ASS ASE AS ASE PAINT TOUCH UP AT RELOCATED DOOR
258 |Chief Assessor 147.69 _ [52-8 1/7 ASE ASE FRESH PAINT ACT
258/Admin 16295 _ [53-3 1/4" CPT TES 1 MATCH EXBTING PID GWE ACT
250|C 128.64 [A7-2 2 CPrTLes | MATCH EXISTING PID GWB ACT 2 FE SOLID COLOR CPT BORDER
26A|Assessors 706.74 [138-11 1/4" AS ASE RESH PAIN AGT
268|Admin 744.80 [141-3 CPTTLES 1 MATCH EXBTING RESH PAIN ACT

Finance Committee - Agenda - 9/16/2020 - P59

By dnadmin on Mon, 11/07/2022 - 13:26
  • Read more about Finance Committee - Agenda - 9/16/2020 - P59

REPLACE DOOR LEAF AND FRAME =~

See air

a Enlarged Kiosk
HOTY SCALE: 1/2" = 1-0"

—————

CHLING NOTES

| WHERE DEAMS, PIFES, AND OF OTHER COMSIRUCTION DETALS
PREVENT THE USE OF STAMOARD RECESSED FETURES, STANDARD
SHALLOW RECESSED FICTURES SHALL BE USED. (FDCTURE CUTS TO-
BE APPROVED BY ARCHITECT,

2, THE GC AND ELECTRICAL COMCTRACTORS SHALL CHECK ALL
CERING HEIGHTS AND CELING PLEPIUM COMDMONS FOR
CLEARANCE OF ALL DUCTWORK LIGHTING, AND OTHER
CEILING HEIGHT SHOWN ON CONTRACT DRAWINGS. ANY

Finance Committee - Agenda - 9/16/2020 - P58

By dnadmin on Mon, 11/07/2022 - 13:26
  • Read more about Finance Committee - Agenda - 9/16/2020 - P58

u Criet Asien:

zh

2 Floor Plan - Assessing [2,200SF)
NH SCALE Wa wy

“ALL EXT. WINDOWS: APPLY 3a Seotchshiele Safety ond.
Securily Window Fim $70 - 7 mil {0.8mm} Single ply

Ww. bas
SSE MIL Ered aw 18° 0.6, pan. STOO WITH

c DSULAT OR)
= S18" TYPE X GWB ROTH SIDE, TAPED A SCREWED PER UL

LUSTING 4 BET PRACTICE,
+ ACOUETIC INSULATION Mei Re eed on
APPROVED EQUAL. RUN CONTRUOLS REA

cor
ACOOIRC SEALAns oT EkooetR OF OF AND ATALL
SEAMS, EXP. JORITS ANO PENETRARONSE.

Finance Committee - Agenda - 9/16/2020 - P57

By dnadmin on Mon, 11/07/2022 - 13:26
  • Read more about Finance Committee - Agenda - 9/16/2020 - P57

TYPICAL EXTERIOR & INTERIOR ALUMINUM DOOR & FRAME:

EATEMIOR

EXTERIRE,

200K PVDF ALUMINUM Wit EXTERIGR SET 1° IMEULATED LOWE

TEMPERED GLAZING. Th

SPECICATION
WNT ERIOR

aU" PVDF ALUMINS Wit CENTER SET 14" TEMPERED CLAZRIG, 3 fr
MEDIUM STRE & RAIL Ye § ir BOTTOM RAIL 4 8 127 JHTERMEDUATE Rak
DOORS, PROVIDE FINISH PER SPECIFICATION.

ALURVFULL ALURHALE

onan & GLAZIIG TO MATCH SURROUHI

Finance Committee - Agenda - 9/16/2020 - P56

By dnadmin on Mon, 11/07/2022 - 13:26
  • Read more about Finance Committee - Agenda - 9/16/2020 - P56

GENERAL NOTES:

1, THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL
LABOR, MATERIALS AND EQUIPMENT REQUIRED FOR AND
REASONABLY INCIDENTAL TO THE CONSTRUCTION OF THE
PROJECT.

2 THE CONTRACTOR SHALL REVIEW AND COORDINATE THE
SCHEOULING OF ALL CONSTRUCTION PHASING WITH THE
OWNER.

3. ALL WORK SHALL CONFORM TO ALL LOCAL BUILDING CODES
AND ORDINANCES, AND ALL OTHER AGENCIES HAVING
JURISDICTION. THE RULES AND REGULATIONS OF OSHA SHALL
BE ADHERED TO FOR THIS PROJECT.

Finance Committee - Agenda - 9/16/2020 - P55

By dnadmin on Mon, 11/07/2022 - 13:26
  • Read more about Finance Committee - Agenda - 9/16/2020 - P55

Monday. Aust 17, 2529

Nashua City Hall Remodel

22495 Main St «=

Nashua =

NH =

City Hall, Nashua, N, H.

LOCUS MAP

| PROJECT SITE

Finance Committee - Agenda - 9/16/2020 - P54

By dnadmin on Mon, 11/07/2022 - 13:26
  • Read more about Finance Committee - Agenda - 9/16/2020 - P54

27 Tanglewood Dr.
Nashua, NH 03062
Office: 603-833-5880
Fax: 603-883-5061

& Associates, Ine.

elbow, not your hands, when tissues aren’t available. Dispose of tissues in the trash after use.
Avoid touching your eyes, nose or mouth as much as possible.

Practice social distancing by limiting person-to-person contact within six feet, especially in large groups or
in enclosed spaces.

Pagination

  • Previous page ‹‹
  • Page 576
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact