Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 6/3/2020 - P217

By dnadmin on Mon, 11/07/2022 - 13:30
  • Read more about Finance Committee - Agenda - 6/3/2020 - P217

ENGINEER by the OWNER’s of such Underground Facilities, including OWNER, or by others. Unless it is otherwise
expressly provided in the Supplementary Conditions:

1. OWNER and ENGINEER shall not be responsible for the accuracy or completeness of any such information or
data; and

2. The cost of all of the following will be included in the Contract Price, and CONTRACTOR shall have full
responsibility for:

a. Reviewing and checking all such information and data,
b. Locating all Underground Facilities shown or indicated in the Contract Documents.

Finance Committee - Agenda - 6/3/2020 - P216

By dnadmin on Mon, 11/07/2022 - 13:30
  • Read more about Finance Committee - Agenda - 6/3/2020 - P216

1.Is of such a nature as to establish that any “technical data” on which CONTRACTOR is entitled to rely as
provided in paragraph 4.02 is materially inaccurate; or

2, Is of such a nature as to require a change in the Contract Documents; or
3. Differs materially from that shown or indicated in the Contract Documents; or

Finance Committee - Agenda - 6/3/2020 - P215

By dnadmin on Mon, 11/07/2022 - 13:30
  • Read more about Finance Committee - Agenda - 6/3/2020 - P215

F. CONTRACTOR shall be responsible for the damage or destruction of property of any character resulting from
neglect, misconduct, or omission in its manner or method of execution or the non-execution of the work, or caused by
defective work or the use of unsatisfactory materials, and such responsibility shall not be released until the work shall
have been completed and accepted and the requirements of the Construction Specifications complied with.

Finance Committee - Agenda - 6/3/2020 - P214

By dnadmin on Mon, 11/07/2022 - 13:30
  • Read more about Finance Committee - Agenda - 6/3/2020 - P214

3.04 Amending and Suppiementing Contract Documents

Finance Committee - Agenda - 6/3/2020 - P213

By dnadmin on Mon, 11/07/2022 - 13:30
  • Read more about Finance Committee - Agenda - 6/3/2020 - P213

C. Clarifications and interpretations of the Contract Documents shall be issued by ENGINEER as provided in Article
9.

3.02 Reference Standards
A. Standards, Specifications, Codes, Laws, and Regulations

Finance Committee - Agenda - 6/3/2020 - P212

By dnadmin on Mon, 11/07/2022 - 13:30
  • Read more about Finance Committee - Agenda - 6/3/2020 - P212

1. A preliminary progress schedule indicating the times (numbers of days or dates) for starting and completing the
various stages of the Work, including any Milestones specified in the Contract Documents;

2. A preliminary schedule of Shop Drawing and Sample submittals which will list each required submittal and the
times for submitting, reviewing, and processing such submittal; and

Finance Committee - Agenda - 6/3/2020 - P211

By dnadmin on Mon, 11/07/2022 - 13:30
  • Read more about Finance Committee - Agenda - 6/3/2020 - P211

D. Furnish, Install, Perform, Provide

1. The word “furnish,” when used in connection with services, materials, or equipment, shall mean to supply and
deliver said services, materials, or equipment to the Site (or some other specified location) ready for use or
installation and in usable or operable condition.

2. The word “install,” when used in connection with services, materials, or equipment, shall mean to furnish and
install said services, materials, or equipment complete and ready for intended use.

Finance Committee - Agenda - 6/3/2020 - P210

By dnadmin on Mon, 11/07/2022 - 13:30
  • Read more about Finance Committee - Agenda - 6/3/2020 - P210

which it is intended. The terms “substantially complete” and “substantially completed” as applied to all or part of
the Work refer to Substantial Completion thereof.

44. Supplementary Conditions--That part of the Contract Documents which amends or supplements these
Generali Conditions.

45. Supplier--A manufacturer, fabricator, supplier, distributor, material man, or vendor having a direct contract
with CONTRACTOR or with any Subcontractor to furnish materials or equipment to be incorporated in the Work
by CONTRACTOR or any Subcontractor.

Finance Committee - Agenda - 6/3/2020 - P209

By dnadmin on Mon, 11/07/2022 - 13:30
  • Read more about Finance Committee - Agenda - 6/3/2020 - P209

28. Notice af Award--The written notice by OWNER to the apparent successful bidder stating that upon timely
compliance by the apparent successful bidder with the conditions precedent listed therein, OWNER will sign and
deliver the Agreement.

29. Notice to Proceed-A written notice given by OWNER to CONTRACTOR fixing the date on which the
Contract Times will commence to run and on which CONTRACTOR shall start to perform the Work under the
Contract Documents.

Finance Committee - Agenda - 6/3/2020 - P208

By dnadmin on Mon, 11/07/2022 - 13:30
  • Read more about Finance Committee - Agenda - 6/3/2020 - P208

Approved Shop Drawings and the reports and drawings of subsurface and physical conditions are not Contract
Documents. Only printed or hard copies of the items listed in this paragraph are Contract Documents. Files in
electronic media format of text, data, graphics, and the like that may be furnished by OWNER to CONTRACTOR
are not Contract Documents.

Pagination

  • Previous page ‹‹
  • Page 488
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact