Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 4/15/2020 - P240

By dnadmin on Mon, 11/07/2022 - 13:32
  • Read more about Finance Committee - Agenda - 4/15/2020 - P240

SG160WL12

2018

REFERENCE LIST OF SELECTED GENERATORS FOR SHPP OF THE G&Em COMPANY

Finance Committee - Agenda - 4/15/2020 - P239

By dnadmin on Mon, 11/07/2022 - 13:32
  • Read more about Finance Committee - Agenda - 4/15/2020 - P239

7. Paint and shipping room

8. Installation, service, technical support at the customer

Ideal service solutions by the designer of the specific machine.

REFERENCES

e Baumiller Nirnberg GmbH

e &KD Blansko Engineering, a.s.

e @KD Blansko SMALL HYDRO, s.r.o.

e Energi Teknikk AS

e Fadum Tekniske AS

e HYDROPOL Project & Management a:s.
e MEZOPRAVNA spol. s r.o.

e Strojirny Brno, a.s.

e Other reference and contact persons on request

Finance Committee - Agenda - 4/15/2020 - P238

By dnadmin on Mon, 11/07/2022 - 13:32
  • Read more about Finance Committee - Agenda - 4/15/2020 - P238

4, Winding of rotors and stators

6. Own test room with up to 5 MW output
Testing of-horizontal and vertical machines.

Finance Committee - Agenda - 4/15/2020 - P237

By dnadmin on Mon, 11/07/2022 - 13:32
  • Read more about Finance Committee - Agenda - 4/15/2020 - P237

PRODUCTION FACILITIES

1. Production hall and premises

e Newhall 54 x 18 m with equipment, total production area of 7,200 m?

e Production capacity is 100 machines per year

2. Laser cutting of sheets up to 5 mm thick

Prima Power Platino fiber

3. Stacking of rotors and stators

Finance Committee - Agenda - 4/15/2020 - P236

By dnadmin on Mon, 11/07/2022 - 13:32
  • Read more about Finance Committee - Agenda - 4/15/2020 - P236

Specialized in generators for hydro-electric power plants:

Advanced design
Careful workmanship
High efficiency

Long service life

Reliable operation

Generator design:

Own calculations of electromagnetic circuits and their constant optimization

Mechanical parts with 3D software [| robust for catching the turbine forces

Bearings from first-class manufacturers (roller, slide type

Finance Committee - Agenda - 4/15/2020 - P235

By dnadmin on Mon, 11/07/2022 - 13:32
  • Read more about Finance Committee - Agenda - 4/15/2020 - P235

GENERATORS FOR SMALL HYDRO
POWER PLANTS

G&Em s.r.o. is a dynamically developing company dedicated to the design and manufacture of electric

rotating machines, specialized in generators for small hydro power stations.

We not only have extensive expertise and technical competences, but we also have many years of
experience in the field. We continue to build on this history in the design of generators and electric
motors with more than 40 years already under our belts. In addition to our own R&D, we cooperate

Finance Committee - Agenda - 4/15/2020 - P234

By dnadmin on Mon, 11/07/2022 - 13:32
  • Read more about Finance Committee - Agenda - 4/15/2020 - P234

OfEXEX0F
Aaa

a | f 5 | S r | £ | 2 t
oy oo a EV sae 3
‘ av38 ‘LYHuOd ui 513

ONIMV YO NOISNSWIG ‘AR oud Senuod | -ANYSH HZO3N ANATISA 3

KAQHSAWZOY MALY OVN ans (O-LOOLd LARELDSUN ou ana 31 Auguzoe M068 3

r “ ae AgZYN SHAAN Q SP NOS FNZEYESO Vv :

= - a Ties 051

Sidded ‘avAOLOTd! OLAMBSL9S ILSONW! N3dNLS S|

; . E5672 N3NS3 5

02 8 €Z HNLVO <UB2UN [ua EGER TINLEY AdAL/dAL OaVAg iNEavHZG - 3

4BSrG fF UWWAHIS| Sid0d | HALYd SidOd Aad] 2 ¥ 378927 OSI "OZ6EL OSI SOL O- £4 Ode2L 3

In

Finance Committee - Agenda - 4/15/2020 - P233

By dnadmin on Mon, 11/07/2022 - 13:32
  • Read more about Finance Committee - Agenda - 4/15/2020 - P233

Type Test of Synchronous Generators of SG Series

Testing according to EN 60034-1 standard

—_

Generator inspection and machine completeness test

Measurement of winding insulation resistances before testing

Measurement of winding resistances

Measurement of resistance of temperature sensors and conirol of built-in accessories

Measurement of voltage symmetry

Phase sequence check and direction of rotation check

No-load characteristic

Interturn insulation test, 130%U, — 3 min

©) OPN) oO) a; sk) oO!) r

Finance Committee - Agenda - 4/15/2020 - P232

By dnadmin on Mon, 11/07/2022 - 13:32
  • Read more about Finance Committee - Agenda - 4/15/2020 - P232

- The list of tests included in the attached file - Test Specification of SG Series Generators.

G&Em s.r.o. email: info@gaem.cz tel: +420 773 338 013

Finance Committee - Agenda - 4/15/2020 - P231

By dnadmin on Mon, 11/07/2022 - 13:32
  • Read more about Finance Committee - Agenda - 4/15/2020 - P231

- Vertical, synchronous, 3-phase, air cooled, brushless generator.
- The delivery includes below mentioned:
- Free shaft end could be designed according to your request (max Lde = 600 mm),
but max @ 205 for DE and @ 160 for NDE. Solid shaft.
- The generator is designed with a wound rotor according to the highest industry standards and
safely withstand all overloads and other stresses encountered during rigorous operation.
- The magnetic core, coils, wedges and supports will be impregnated.

Pagination

  • Previous page ‹‹
  • Page 433
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact