Finance Committee - Agenda - 3/17/2021 - P427
ITEM 403.11 - HOT BITUMINOUS PAVEMENT (METHOD
SPECIFICATION), MACHINE METHOD
ITEM 403.119 - HOT BITUMINOUS PAVEMENT (METHOD
SPECIFICATION), MACHINE METHOD, HIGH STRENGTH
A. SCOPE
This work shall consist of furnishing and placing bituminous pavement to the depth shown on
the plans or ordered by the Engineer. Work shall also include obtaining asphalt samples and
asphalt cores on behalf of the City for quality control testing.
B. MATERIALS AND CONSTRUCTION