Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 3/17/2021 - P567

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P567

Environmental
Consultants & Contractors

February 4, 2021

EXHIBIT D

Kerry Converse

Environmental Engineer

City of Nashua Solid Waste Department
840 West Hollis Street

Nashua, NH 03062

(603) 589-3420

conversek@nashuanh.gov

Subject: Landfill Gas Collection System Expansion
Four Hills Landfill Concrete Block Wall Corrective Action, Nashua, New Hampshire

Dear Mr. Converse,

Finance Committee - Agenda - 3/17/2021 - P566

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P566

STR AahDORHERDNaOSIOMTES, MS

NOTES:

HDPE PIPE FOR GAS COLLECTION SHALL BE SDR 17. FITTINGS MAYBE SDR 17 OR SDR 11

n

COMPRESSED AIR PIPE SHALL BE SDR 9 HDPE.

CONDENSATE MAINS SHALL BE SDR 11 HDPE.

Py

NOTE:

4. PROVIDE SLACK IN GEOMEMBRANE BOOTS TO ALLOWFOR FUTURE SETTLEMENT

pO

4. SOLID HDPE PIPE SHALL BE BUTT-FUSION WELDED UNLESS OTHERWISE INDICATED. 3
BENTONITE SEAL

5. ON LANDFILL SIDESLOPES, PROVIDE MINIMUM 2 FEET OF COVER OVER SOLID HDPE PIPE AND.

Finance Committee - Agenda - 3/17/2021 - P565

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P565

es

oan annmont

FERNCO CAP
(WELLHEAD LOCATED ELSEWHERE)

EASY LEVEL
FILTER/REGULATOR INDICATOR
AND CYCLE COUNTER
QED 8" WELL CAP
> (MODEL GWC8283)

AR FLUID
= —
SUPPLY

DISCHARGE

h \ _— 8° SCH BO PVC WELL CASING
rs LEVEL,

LIQUID PROBE.
| SET AT MID WELL DEPTH

S

WASTE

C

AIR, EXHAUST
& DISCHARGE
FITTINGS

I L+t}-— AP4'B BOTTOM LOADING AUTOPUMP (LONG)
ll BY QED ENVIRONMENTAL OR EQUIVALENT,
I APPROVED BY OWNER

Finance Committee - Agenda - 3/17/2021 - P564

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P564

90th aahmOnERDNaDSOTES

3
8

EXISTING —_, |

CONCRETE
BLOCK WALL
(HEIGHT
VARIES)

NOTES:

Finance Committee - Agenda - 3/17/2021 - P563

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P563

NOTE:

4. REFER TO SHEET 1 FOR ADDITIONAL NOTES AND LEGEND. START OF EXISTING (©
CONCRETE BLOCK WALL

a —_ = :
_
LEGEND (PROPOSED): a
2 LANDFILL GAS (LFG) CONVEYANCE PIPE SS ~
= (SIZE AND SLOPE DIRECTION) <<) s es A ~ ~
3 Ef LAYER
< -

Finance Committee - Agenda - 3/17/2021 - P562

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P562

3
2
2

9 2001 SANDOR, HEAD & ASSDINTES. MB

Finance Committee - Agenda - 3/17/2021 - P561

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P561

Z
é
i
5
zg

=o
TO LANDFILL GAS LPs

O ENERGY n=
IT
£

Finance Committee - Agenda - 3/17/2021 - P560

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P560

PREPARED FOR:

CONCRETE BLOCK WALL CORRECTIVE ACTION

FOUR HILLS LANDFILL
NASHUA, NEW HAMPSHIRE
DES-SW-SP-95-002
JANUARY 2021

EXHIBIT C

SHEET INDEX

SHEET 1 EXISTING CONDITIONS PLAN

SHEET 2 PROPOSED WEST WALL CORRECTIVE ACTION PLAN
SHEET 3 PROPOSED EAST WALL CORRECTIVE ACTION PLAN
SHEETS 4-6 DETAILS

FROM: USGS TOPOGRAPHIC MAP- NASHUA, NEWHAMPSHIRE (2003)

LOCUS PLAN

SCALE: 1"=1000'

CITY OF NASHUA

FOUR HILLS LANDFILL

NASHUA, NEW HAMPSHIRE

PREPARED BY:

Finance Committee - Agenda - 3/17/2021 - P559

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P559

Specification 15212 - Polyvinyl Chloride (PVC) Pipe And Fittings Page 3 of 3
January 2021 3066.21

J. After solvent welding, the pipe shall remain undisturbed until cement has
reached initial set. As a guideline for joint setting time, use 1 hour for ambient
temperatures between 60 and 100°F, or 2 hours when ambient temperature is
between 40 and 60°F.

K. Pipe and pipe fittings shall be selected so that there will be as small a deviation

Finance Committee - Agenda - 3/17/2021 - P558

By dnadmin on Mon, 11/07/2022 - 13:46
  • Read more about Finance Committee - Agenda - 3/17/2021 - P558

Specification 15212 - Polyvinyl Chloride (PVC) Pipe And Fittings Page 2 of 3
January 2021 3066.21

PART 3 - EXECUTION
3.1 PVC PIPE HANDLING
A. PVC pipe and pipe fittings shall be handled carefully in loading and unloading.
They shall be lifted by hoists and lowered on skidways in such a manner as to
avoid shock. Derricks, ropes, or other suitable equipment shall be used for
lowering the pipe into well borings. Pipe and pipe fittings shall not be dropped
or dumped.

3.2 PVC PIPE INSTALLATION

Pagination

  • Previous page ‹‹
  • Page 159
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact