Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 6/7/2017 - P42

By dnadmin on Mon, 11/07/2022 - 10:22
  • Read more about Finance Committee - Agenda - 6/7/2017 - P42

Technical Specifications IFB0660-040617
2017 Pavement Preservation
Revised per Addendum #1

Preparation and Placement of Sealant

No crack sealant material shall be applied in wet cracks or where frost, snow or ice is present, or
when the ambient temperature is below 25 degrees F.

Finance Committee - Agenda - 6/7/2017 - P41

By dnadmin on Mon, 11/07/2022 - 10:22
  • Read more about Finance Committee - Agenda - 6/7/2017 - P41

Technical Specifications | IFB0660-040617
2017 Pavement Preservation
Revised per Addendum #1

Tensile Strength (ASTM D2256-90) >70,000 psi

Diameter 0.0008 in. **

Specific Gravity (ASTM D792-91) 1.32 to 1.40

* At temperatures ranging from ambient to maximum finished product mix
temperature

** Subject to Normal Variations

Finance Committee - Agenda - 6/7/2017 - P40

By dnadmin on Mon, 11/07/2022 - 10:22
  • Read more about Finance Committee - Agenda - 6/7/2017 - P40

v

Technical Specifications iIFB0660-040617
2017 Pavement Preservation
Revised per Addendum #1

ITEM 405.11 - CRACK SEALING

A. SCOPE

The work covered by this section of the specification consists of furnishing all materials, labor,
transportation, and equipment necessary to perform all operations in connection with the
cleaning and sealing of construction and random cracks in bituminous concrete pavements,
including vegetation removal and sterilization of cracks, where necessary.

B. MATERIAL

Finance Committee - Agenda - 6/7/2017 - P39

By dnadmin on Mon, 11/07/2022 - 10:22
  • Read more about Finance Committee - Agenda - 6/7/2017 - P39

Technical Specifications IFB0660-040617
2017 Pavement Preservation
Revised per Addendum #1

All materials, labor, equipment, and transportation for the following is considered subsidiary to
this item: mobilization and demobilization, street sweeping, installing and removing plastic on
manhole and service entrances, and tack coat.

13

Finance Committee - Agenda - 6/7/2017 - P38

By dnadmin on Mon, 11/07/2022 - 10:22
  • Read more about Finance Committee - Agenda - 6/7/2017 - P38

‘ Technical Specifications IFB0660-040617
2017 Pavement Preservation
Revised per Addendum #1

Rolling

If required by the Engineer, specified areas shall be rolled by a self-propelled, 5 to10 ton
pneumatic roller with a tire pressure of 50 PSI and equipped with a water spray system.

H. QUALITY CONTROL
Materials

Finance Committee - Agenda - 6/7/2017 - P37

By dnadmin on Mon, 11/07/2022 - 10:22
  • Read more about Finance Committee - Agenda - 6/7/2017 - P37

Technical Specifications IFB0660-040617
2017 Pavement Preservation
Revised per Addendum #1

The surface should be pre-wetted by fogging ahead of the spreader box when required by surface
and ambient conditions. The rate of application of the fog spray shall be adjusted during the day
to suit temperatures, surface texture, humidity, and dryness of the pavement surface.

Finance Committee - Agenda - 6/7/2017 - P36

By dnadmin on Mon, 11/07/2022 - 10:22
  • Read more about Finance Committee - Agenda - 6/7/2017 - P36

Technical Specifications IFB0660-040617
2017 Pavement Preservation
Revised per Addendum #1

materials to be used may be acceptable provided they were made during the same calendar year.
The documentation shall include the individual calibration of each material at various settings,
which can be related to the machine metering devices.

E. WEATHER LIMITATIONS

Finance Committee - Agenda - 6/7/2017 - P35

By dnadmin on Mon, 11/07/2022 - 10:22
  • Read more about Finance Committee - Agenda - 6/7/2017 - P35

Technical Specifications IFB0660-040617
2017 Pavement Preservation
Revised per Addendum #1

Proportioning Devices

Individual volume or weight controls for proportioning each material to be added to the mix, i.e.,
aggregate, emulsified asphalt, mineral and field control additives, and water shall be provided
and properly marked. These proportioning devices are usually revolution counters or similar
devices, and are used in material calibration and determining the materials output at any time.

Emulsion Pump

Finance Committee - Agenda - 6/7/2017 - P34

By dnadmin on Mon, 11/07/2022 - 10:22
  • Read more about Finance Committee - Agenda - 6/7/2017 - P34

Technical Specifications IFB0660-040617
2017 Pavement Preservation
Revised per Addendum #1

Fibers 0.05% to 0.25% by dry weight of aggregate as required to meet the
performance requirements of the TxDOT Overlay Test (Tex-248-
F) as described above

Aggregate - Recommended Gradations:

Type II Production

Screen Size % Passing Tolerance

3/8” 100 + 7.0/+7.0
#4 90-100 + 7.0
#8 65-90 + 4.0
#16 45-70 + 4.0
#30 30-50 + 4.0
#50 18-30 + 4.0
#100 10-21 + 4.0
#200 5-15 + 2.0

Finance Committee - Agenda - 6/7/2017 - P33

By dnadmin on Mon, 11/07/2022 - 10:22
  • Read more about Finance Committee - Agenda - 6/7/2017 - P33

Technical Specifications IFB0660-040617
2017 Pavement Preservation
Revised per Addendum #1

Fiber-Reinforced Mix Design

Fiber-reinforced mix designs shall be tested for flexibility utilizing the TxDOT Overlay Test
(Tex-248-F) traditionally used for hot mix asphalts (HMA), and adapted for micro-surfacing as
follows:

1.) Section 2.1 -- constant maximum displacement should be increased from 0.025 in. to
0.050 in., 10 seconds (one cycle) to 60 seconds (one cycle).

Pagination

  • Previous page ‹‹
  • Page 1445
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact