Finance Committee - Agenda - 5/17/2017 - P196

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P196

1. Is of such a nature as to establish that any “technical data” on which CONTRACTOR is entitled to rely as
provided in paragraph 4.02 is materially inaccurate; or

2. Is of such a nature as to require a change in the Contract Documents; or
3. Differs materially from that shown or indicated in the Contract Documents; or

Finance Committee - Agenda - 5/17/2017 - P195

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P195

F. CONTRACTOR shall be responsible for the damage or destruction of property of any character resulting from
neglect, misconduct, or omission in its manner or method of execution or the non-execution of the work, or caused by
defective work or the use of unsatisfactory materials, and such responsibility shall not be released until the work shall
have been completed and accepted and the requirements of the Construction Specifications complied with.

Finance Committee - Agenda - 5/17/2017 - P194

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P194

3.04 Amending and Supplementing Contract Documents

Finance Committee - Agenda - 5/17/2017 - P193

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P193

C. Clarifications and interpretations of the Contract Documents shall be issued by ENGINEER as provided in Article
9.

3.02 Reference Standards
A. Standards, Specifications, Codes, Laws, and Regulations

Finance Committee - Agenda - 5/17/2017 - P192

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P192

1. A preliminary progress schedule indicating the times (numbers of days or dates) for starting and completing the
various stages of the Work, including any Milestones specified in the Contract Documents;

2. A preliminary schedule of Shop Drawing and Sample submittals which will list each required submittal and the
times for submitting, reviewing, and processing such submittal; and

Finance Committee - Agenda - 5/17/2017 - P191

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P191

D. Furnish, Install, Perform, Provide

1. The word “furnish,” when used in connection with services, materials, or equipment, shall mean to supply and
deliver said services, materials, or equipment to the Site (or some other specified location) ready for use or
installation and in usable or operable condition.

2. The word “install,” when used in connection with services, materials, or equipment, shall mean to furnish and
install said services, materials, or equipment complete and ready for intended use.

Finance Committee - Agenda - 5/17/2017 - P190

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P190

with the Contract Documents, so that the Work (or a specified part thereof) can be utilized for the purposes for
which it is intended. The terms “substantially complete” and “substantially completed” as applied to all or part of
the Work refer to Substantial Completion thereof.

44. Supplementary Conditions--That part of the Contract Documents which amends or supplements these
General Conditions.

Finance Committee - Agenda - 5/17/2017 - P189

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P189

28. Notice of Award--The written notice by OWNER to the apparent successful bidder stating that upon timely
compliance by the apparent successful bidder with the conditions precedent listed therein, OWNER will sign and
deliver the Agreement.

29. Notice to Proceed--A written notice given by OWNER to CONTRACTOR fixing the date on which the
Contract Times will commence to run and on which CONTRACTOR shall start to perform the Work under the
Contract Documents.

Finance Committee - Agenda - 5/17/2017 - P188

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P188

specifically identified in the Agreement, together with all Written Amendments, Change Orders, Field Orders, and
ENGINEER’s written interpretations and clarifications issued on or after the Effective Date Of the Agreement.
Approved Shop Drawings and the reports and drawings of subsurface and physical conditions are not Contract
Documents. Only printed or hard copies of the items listed in this paragraph are Contract Documents. Files in
electronic media format of text, data, graphics, and the like that may be furnished by OWNER to CONTRACTOR

Finance Committee - Agenda - 5/17/2017 - P187

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P187

GENERAL CONDITIONS

ARTICLE 1 - DEFINITIONS AND TERMINOLOGY

1.01 Defined Terms

A. Wherever used in the Contract Documents and printed with initial or all capital letters, the terms listed below will
have the meanings indicated which are applicable to both the singular and plural thereof.

1. Addenda--Written or graphic instruments issued prior to the opening of Bids, which clarify, correct, or change
the Bidding Requirements or the Contract Documents.