Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 2/1/2017 - P226

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P226

Section 01330 - Submittals Page 2 of 4
August 2016 3066.07

1.4

1.5

1.6

1.7

1.8

C. The schedule shall account for ENGINEER’s Contract Administration and
quality control responsibilities.

PRODUCT DATA

A. CONTRACTOR shall submit copies of product data sheets as required in the
Specifications. CONTRACTOR shall clearly mark each copy of product data
sheets to identify applicable products, models, options, and other data.

MANUFACTURER'S INSTRUCTIONS

Finance Committee - Agenda - 2/1/2017 - P225

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P225

SECTION 01330

SUBMITTALS

PART 1 - GENERAL

1.1

1.2

1.3

DESCRIPTION

A.

This section specifies the general requirements and procedures for preparing
and transmitting data to ENGINEER for their information or review.
CONTRACTOR shall deliver all submittals to ENGINEER in a form acceptable to
ENGINEER.

CONTRACTOR’S DRAWINGS

A.

D.

The Drawings shall show the general arrangement and details as necessary to
provide a comprehensive description of the work to be performed.

Finance Committee - Agenda - 2/1/2017 - P224

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P224

Section 01320- Survey Control Page 2 of 2

August 2016

3066.07

PART 3 - EXECUTION

3.1

GENERAL

A.

CONTRACTOR shall obtain as-built elevation information using the site
coordinate system and datum (in the New Hampshire State Plane coordinate
system, vertical datum NAVD-88, as indicated on the Drawings).

The survey equipment used shall have a precision to the 0.01 feet.

As-built information shall include horizontal and vertical coordinate

information for the following:

Finance Committee - Agenda - 2/1/2017 - P223

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P223

SECTION 01320

SURVEY CONTROL

PART 1 - GENERAL

1.1 SURVEY REFERENCE POINTS

A.

OWNER has established survey control points around the Site for construction
horizontal and vertical control. OWNER shall provide survey control point
information to the CONTRACTOR once the contact is awarded.

Finance Committee - Agenda - 2/1/2017 - P222

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P222

Section 01310 - Project Coordination and Meetings Page 2 of 2

August 2016 3066.07
not conscientious, or not industrious, then CONTRACTOR shall replace the
supervisory representative upon written request of OWNER or ENGINEER.

D. CONTRACTOR shall only employ competent individuals on the job. Whenever

Finance Committee - Agenda - 2/1/2017 - P221

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P221

SECTION 01310

PROJECT COORDINATION AND MEETINGS

PART 1 - GENERAL

1.1

1.2

1.3

PRECONSTRUCTION CONFERENCE

A.

CONTRACTOR shall not commence Work until a preconstruction conference
with representatives of ENGINEER, and OWNER is held. This preconstruction
meeting will be arranged by OWNER and is intended to establish lines of
communication between the parties involved. The time and place of the
preconstruction meeting will be determined at least one week prior to the start
of Work.

PROGRESS MEETINGS

Finance Committee - Agenda - 2/1/2017 - P220

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P220

Section 01290 — Measurement and Payment Page 4 of 4
August 2016 3066.07

PART 2 - PRODUCTS
Not Used.
PART 3 - EXECUTION

Not Used.

[END OF SECTION 01290]

SANBORN ll HEAD

Finance Committee - Agenda - 2/1/2017 - P219

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P219

Section 01290 — Measurement and Payment Page 3 of 4

Finance Committee - Agenda - 2/1/2017 - P218

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P218

Section 01290 — Measurement and Payment Page 2 of 4

August 2016

3066.07

1.3

1.4

D.

Retainage will be with held as defined in the Bid Documents.

PARTIAL PAYMENTS:

A.

Partial payments shall be made as the work progresses. All partial invoices
and payments shall be subject to correction in the final quantity invoice and
payment.

Finance Committee - Agenda - 2/1/2017 - P217

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P217

SECTION 01290

MEASUREMENT AND PAYMENT

PART 1 - GENERAL

1.1 MEASUREMENT OF QUANTITIES

A.

B.

Measurements will not be obtained for lump sum items.

ENGINEER shall verify measurements for all unit price Contract items to
evaluate progress payment applications, and to confirm final quantities of
Work in place prior to the final payment of the Contract based upon digital
Record Drawing provided by CONTRACTOR.

Pagination

  • Previous page ‹‹
  • Page 1275
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact