Board Of Aldermen - Agenda - 4/12/2022 - P163
2. At least 5 days prior to the proposed closure, the CONTRACTOR shall submit a detour traffic plan for each
location being detoured.
3. The CONTRACTOR shall install standard traffic control devices in accordance with the Detour Signage plan
provided in the bid documents and the Manual on Uniform Traffic Control Devices (MUTCD.)
4. The detour signage shall be covered when the road closure is not in effect.
B. CONTRACTOR shall notify the following agencies of any traffic delays or road closures three days in advance of the
work: