Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 8/14/2019 - P114

By dnadmin on Mon, 11/07/2022 - 13:04
  • Read more about Finance Committee - Agenda - 8/14/2019 - P114

Lo. NORMANDEAU City of Nashua

BRA x ASSOCIATES June eee

ENVIRONMENTAL CONSULTANTS

Table 4. 2019-2021 H.L. Turner Group rate table for the City of Nashua Mine Falls Relicensing.

TURNER
ct |

STANDARD FEE SCHEDULE AND PAYMENT TERMS

FEE SCHEDULE
Hourly Bidling Rate”

Finance Committee - Agenda - 8/14/2019 - P113

By dnadmin on Mon, 11/07/2022 - 13:04
  • Read more about Finance Committee - Agenda - 8/14/2019 - P113

’™» NORMANDEAU City of Nashua
BAARF ASSOCIATES June 18, 2019
Se age

ENVIRONMENTAL CONSULTANTS

Table 3. 2019-2021 Normandeau rate table for the City of Nashua Mine Falls Relicensing.

Finance Committee - Agenda - 8/14/2019 - P112

By dnadmin on Mon, 11/07/2022 - 13:04
  • Read more about Finance Committee - Agenda - 8/14/2019 - P112

gf» NORMANDEAU
BRA ASSOCIATES

Table 2. Estimated process cost by task for the Mine Falls relicensing.

Task

Estimated
Hours

Estimated Cost

Proposed and Revised Study Plan

Finance Committee - Agenda - 8/14/2019 - P111

By dnadmin on Mon, 11/07/2022 - 13:04
  • Read more about Finance Committee - Agenda - 8/14/2019 - P111

ff’ NORMANDEAU City of Nashua

FES ASSOCIATES se onee 10

ENVIRONMENTAL CONSULTANTS

date of August 1, 2019 and a set date for filing the Final License Application with FERC no later than two years
before the existing license expires (i.e., August 4, 2021).

Finance Committee - Agenda - 8/14/2019 - P110

By dnadmin on Mon, 11/07/2022 - 13:04
  • Read more about Finance Committee - Agenda - 8/14/2019 - P110

’—» NORMANDEAU City of Nashua
FAFE ASSOCIATES June 18, 2019

a ——————— oes 9
ENVIRFONMENTAL CONSULTANTS Page 9

e The assessment of impingement, entrainment, and survival of diadromous species will be conducted
as a desktop analysis.

e The potential for impingement or entrainment will be characterized based on the relationship of site-
specific intake characteristics along with swim speed and life history characteristics of target fish
species.

Finance Committee - Agenda - 8/14/2019 - P109

By dnadmin on Mon, 11/07/2022 - 13:04
  • Read more about Finance Committee - Agenda - 8/14/2019 - P109

af» NORMANDEAU City of Nashua
AFA ASSOCIATES June 18, 2019
ENVIRONMENTAL CONSULTANTS Page 8

e Determine the flow field conditions which exist in and around the fishway entrances and create a
series of color contour maps of velocity magnitude at a range of discharges for comparison with known

fish swim capabilities.

Agency Recommended Approach:
e Collect necessary data (bed topography, water velocities, water depth) under a range of discharges

and assemble a 3-D computational fluid dynamics model.

Finance Committee - Agenda - 8/14/2019 - P108

By dnadmin on Mon, 11/07/2022 - 13:04
  • Read more about Finance Committee - Agenda - 8/14/2019 - P108

fs NORMANDEAU City of Nashua

BAFE ASSOCIATES Hane 18, 2019

ENVIRONMENTAL CONSULTANTS

© Collect an adequate number of appropriately sized juvenile herring from a location within the
Merrimack River watershed — we have assumed this can be completed in a period of four
evenings.

o PIT-tag a total of 200 juvenile herring and release directly into the power canal at Mine Falls to
evaluate downstream passage.

o Assumes installation and maintenance of a single PIT receiver during the period September-
November.

Finance Committee - Agenda - 8/14/2019 - P107

By dnadmin on Mon, 11/07/2022 - 13:04
  • Read more about Finance Committee - Agenda - 8/14/2019 - P107

ff» NORMANDEAU City of Nashua
BARA ASSOCIATES june 18, 2019
ENVIRONMENTAL a eG age

ENVIRONMENTAL CONSULTANTS

Finance Committee - Agenda - 8/14/2019 - P106

By dnadmin on Mon, 11/07/2022 - 13:04
  • Read more about Finance Committee - Agenda - 8/14/2019 - P106

os NORMANDEAU City of Nashua
ARS ASSOCIATES June 18, 2019

ENVIRONMENTAL CONSULTANTS

Page 5

Assess nearfield attraction to and entrance efficiency of fish lift.

Collect lift efficiency data to include rates of approach to fishway entrances, entry into the fishway,
and passage under varied operational! conditions.

Determine proportion of post-spawned adult downstream migration route selection, passage
efficiency, and delay associated with the power canal under various operating conditions.

Finance Committee - Agenda - 8/14/2019 - P105

By dnadmin on Mon, 11/07/2022 - 13:04
  • Read more about Finance Committee - Agenda - 8/14/2019 - P105

f= NORMANDEAU City of Nashua

ARS ASSOCIATES June 18, 2019

ENVIRONMENTAL CONSULTANTS Page 4

e Evaluate potential effects of project operation (including routine maintenance activities) on freshwater
mussels residing in project waters.

Pagination

  • Previous page ‹‹
  • Page 777
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact