Finance Committee - Agenda - 3/20/2019 - P275

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P275

9.10 Limitations on ENGINEER's Authority and Responsibilities

Finance Committee - Agenda - 3/20/2019 - P274

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P274

amount or extent, if any, of any adjustment in the Contract Price or Contract Times, or both, that should be allowed as
a result of a written clarification or interpretation, a Claim may be made therefore as provided in paragraph 10.05.

9.05 Authorized Variations in Work

Finance Committee - Agenda - 3/20/2019 - P273

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P273

8.10 Undisclosed Hazardous Environmental Condition

A. OWNER's responsibility in respect to an undisclosed Hazardous Environmental Condition is set forth in paragraph
4.06

8.11 Evidence of Financial Arrangements
A. If and to the extent OWNER has agreed to furnish CONTRACTOR reasonable evidence that financial arrangements

have been made to satisfy OWNER's obligations under the Contract Documents, OWNER's responsibility in respect
thereof will be as set forth in the Supplementary Conditions.

Finance Committee - Agenda - 3/20/2019 - P272

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P272

B. Unless otherwise provided in the Supplementary Conditions, OWNER shall have sole authority and responsibility
for such coordination.

ARTICLE 8 - OWNER'S RESPONSIBILITIES

8.01 Communications to Contractor

A. Except as otherwise provided in these General Conditions, OWNER shall issue all communications to
CONTRACTOR through ENGINEER.

8.02 Replacement of ENGINEER

A. In case of termination of the employment of ENGINEER, OWNER shall appoint and whose status under the
Contract Documents shall be that of the former ENGINEER.

Finance Committee - Agenda - 3/20/2019 - P271

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P271

anyone for whose acts any of them may be liable, the indemnification obligation under paragraph 6.20.A shall not be
limited in any way by any limitation on the amount or type of damages, compensation, or benefits payable by or for
CONTRACTOR or any such Subcontractor, Supplier, or other individual or entity.

Finance Committee - Agenda - 3/20/2019 - P270

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P270

6.18 Continuing the Work

A. CONTRACTOR shall carry on the Work and adhere to the progress schedule during all disputes or disagreements
with OWNER. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as
permitted by paragraph 15.04 or as OWNER and CONTRACTOR may otherwise agree in writing.

6.19 CONTRACTOR’s General Warranty and Guarantee

Finance Committee - Agenda - 3/20/2019 - P269

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P269

D. Submittal Procedures
1. Before submitting each Shop Drawing or Sample, CONTRACTOR shall have determined and verified:

a. All field measurements, quantities, dimensions, specified performance criteria, installation requirements,
materials, catalog numbers, and similar information with respect thereto;

b. All materials with respect to intended use, fabrication, shipping, handling, storage, assembly, and
installation pertaining to the performance of the Work;

Finance Committee - Agenda - 3/20/2019 - P268

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P268

CONTRACTOR shall be repaired or replaced in a condition equal to or better than the condition prior to the damage.
Such repair or replacement shall be accomplished at the CONTRACTOR’s expense without additional compensation
from the OWNER.

Finance Committee - Agenda - 3/20/2019 - P267

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P267

8. All changes or modifications which result from the final inspection.

The As-built marked prints shall be delivered to the ENGINEER at the time of final inspection for ENGINEER's
review and approval. All approval and acceptance of As-built drawings shall be accomplished before final payment is
made to the CONTRACTOR.

6.13 Safety and Protection

Finance Committee - Agenda - 3/20/2019 - P266

By dnadmin on Mon, 11/07/2022 - 13:09
  • Read more about Finance Committee - Agenda - 3/20/2019 - P266

construction equipment and machinery, and surplus materials and shall restore to original condition all property not
designated for alteration by the Contract Documents.

D. Loading Structures:

CONTRACTOR shall not load nor permit any part of any structure to be loaded in any manner that will endanger
the structure, nor shall CONTRACTOR subject any part of the Work or adjacent property to stresses or pressures
that will endanger it.