Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 3/6/2019 - P104

By dnadmin on Mon, 11/07/2022 - 13:10
  • Read more about Finance Committee - Agenda - 3/6/2019 - P104

b. Locating all Underground Facilities shown or indicated in the Contract Documents.

c. Coordination of the Work with the OWNER’s of such Underground Facilities, including OWNER, during
construction, and

d. The safety and protection of all such Underground Facilities and repairing any damage thereto resulting
from the Work.

B. Not Shown or Indicated

Finance Committee - Agenda - 3/6/2019 - P103

By dnadmin on Mon, 11/07/2022 - 13:10
  • Read more about Finance Committee - Agenda - 3/6/2019 - P103

Work in connection therewith (except in an emergency as required by paragraph 6.16.A), notify OWNER and
ENGINEER in writing about such condition. CONTRACTOR shall not further disturb such condition or perform
any Work in connection therewith (except as aforesaid) until receipt of written order to do so.

B. ENGINEER’s Review: After receipt of written notice as required by paragraph 4.03.A, ENGINEER will
promptly review the pertinent condition, determine the necessity of OWNER’s obtaining additional exploration or tests

Finance Committee - Agenda - 3/6/2019 - P102

By dnadmin on Mon, 11/07/2022 - 13:10
  • Read more about Finance Committee - Agenda - 3/6/2019 - P102

necessary, and the cost thereof shall be deducted from any compensation due, or which may become due, the
CONTRACTOR under its Contract.

4.02 Subsurface and Physical Conditions
A. Reports and Drawings:

1. Those reports of explorations and tests of subsurface conditions at or contiguous to the Site that ENGINEER has
used in preparing the Contract Documents; and

Finance Committee - Agenda - 3/6/2019 - P101

By dnadmin on Mon, 11/07/2022 - 13:10
  • Read more about Finance Committee - Agenda - 3/6/2019 - P101

3.05 Reuse of Documents

Finance Committee - Agenda - 3/6/2019 - P100

By dnadmin on Mon, 11/07/2022 - 13:10
  • Read more about Finance Committee - Agenda - 3/6/2019 - P100

1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association,
or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard,
specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective
Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract
Documents.

Finance Committee - Agenda - 3/6/2019 - P99

By dnadmin on Mon, 11/07/2022 - 13:10
  • Read more about Finance Committee - Agenda - 3/6/2019 - P99

as the basis for progress payments during performance of the Work. Such prices will include an appropriate
amount of overhead and profit applicable to each item of Work.

Finance Committee - Agenda - 3/6/2019 - P98

By dnadmin on Mon, 11/07/2022 - 13:10
  • Read more about Finance Committee - Agenda - 3/6/2019 - P98

2. The word “install,” when used in connection with services, materials, or equipment, shall mean to furnish and
install said services, materials, or equipment complete and ready for intended use.

3, The words “perform” or ‘Provide,” when used in connection with services, materials, or equipment, shall mean
to furnish and install said services, materials, or equipment complete and ready for intended use.

Finance Committee - Agenda - 3/6/2019 - P97

By dnadmin on Mon, 11/07/2022 - 13:10
  • Read more about Finance Committee - Agenda - 3/6/2019 - P97

45. Supplier--A manufacturer, fabricator, supplier, distributor, material man, or vendor having a direct contract
with CONTRACTOR or with any Subcontractor to furnish materials or equipment to be incorporated in the Work
by CONTRACTOR or any Subcontractor.

Finance Committee - Agenda - 3/6/2019 - P96

By dnadmin on Mon, 11/07/2022 - 13:10
  • Read more about Finance Committee - Agenda - 3/6/2019 - P96

29. Notice to Proceed--A written notice given by OWNER to CONTRACTOR fixing the date on which the
Contract Times will commence to run and on which CONTRACTOR shall start to perform the Work under the
Contract Documents.

30. OWNER--The individual, entity, public body, or authority with whom CONTRACTOR has entered into the
Agreement and for whom the Work is to be performed.

Finance Committee - Agenda - 3/6/2019 - P95

By dnadmin on Mon, 11/07/2022 - 13:10
  • Read more about Finance Committee - Agenda - 3/6/2019 - P95

electronic media format of text, data, graphics, and the like that may be furnished by OWNER to CONTRACTOR
are not Contract Documents.

13. Contract Price--The moneys payable by OWNER to CONTRACTOR for completion of the Work in
accordance with the Contract Documents as stated in the Agreement (subject to the provisions of paragraph 11.03
in the case of Unit Price Work).

Pagination

  • Previous page ‹‹
  • Page 662
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact