Finance Committee - Agenda - 3/6/2019 - P164
Technical Specifications FY2019 Paving Program
ITEM 306.114 — RECLAIMED STABILIZED BASE PROCESSED IN
PLACE, 14” DEEP (F)
A. SCOPE
Technical Specifications FY2019 Paving Program
ITEM 306.114 — RECLAIMED STABILIZED BASE PROCESSED IN
PLACE, 14” DEEP (F)
A. SCOPE
Technical Specifications FY2019 Paving Program
ITEM 203.113 - DRIVEWAY EXCAVATION AND REGRADE
A. SCOPE
This work includes removing asphalt and concrete driveway materials to subbase, regrading, and
placing new pavement in kind. This item will only be used on roadways which are being
reclaimed or as directed by the Engineer.
B. MATERIALS AND CONSTRUCTION
Technical Specifications FY2019 Paving Program
ITEM 203.112 -ROAD EXCAVATION AND REGRADE
A. SCOPE
This work includes repair to subgrade and regrading and replacing removed subgrade material
with pavement at specific locations as directed by the Engineer.
This item will only be used at locations identified by the Engineer. In other areas where
subgrade is exposed during milling, grading and compaction of disturbed subgrade will be
incidental to subsequent paving.
B. MATERIALS AND CONSTRUCTION
DIVISION 10
TECHNICAL SPECIFICATIONS
RESPONSIBILITIES
OWNER: City of Nashua
CONTRACTOR:
The following documents are attached to and made a part of this Certificate:
[For items to be attached see definition of Substantial Completion as supplemented and other specifically
noted conditions precedent to achieving Substantial Completion as required by Contract Documents.}
This certificate does not constitute an acceptance of Work not in accordance with the Contract Documents
nor is it a release of CONTRACTOR’s obligation to complete the Work in accordance with the Contract
CERTIFICATE OF SUBSTANTIAL COMPLETION
PROJECT:
OWNER’S CONTRACT NO:
DATE OF ISSUANCE:
OWNER: City of Nashua, NH
OWNER’s Purchase Order NO.:
CONTRACTOR:
ENGINEER: DPW Engineering
This Certificate of Substantial Completion applies to all Work under the Contract Documents or to the
following specified parts thereof:
TO City of Nashua
(OWNER)
And To
(CONTRACTOR)
Summary
CHANGE IN CONTRACT PRICE:
Original Contract Price
$
CHANGE IN CONTRACT TIMES:
Original Contract Times
Substantial completion:
Ready for final payment:
Net changes from previous Change Orders
$
Net change from previous Change Orders
Contract Price prior to this Change Order
$
Contract Times prior to this Change Order
Substantial completion:
Ready for final payment:
Net Increase (deerease)
of this Change Order
$
PROJECT:
CHANGE ORDER
OWNER’S CONTRACT NO:
EXECUTED CONTRACT DATE:
DATE OF ISSUANCE:
OWNER:
OWNER’s Purchase Order NO.:
EFFECTIVE DATE:
City of Nashua, NH
Upon City Approval
CONTRACTOR:
ENGINEER:
DPW Engineering
You are directed to make the following changes in the Contract Documents:
Description:
Justification:
Change Order #
1 of 2
NOTICE TO PROCEED
DATED:
TO:
(Contractor)
ADDRESS:
OWNER’S CONTRACT NO.
PROJECT:
(Insert name of Contract as it appears in the Bidding Document)
You are notified that the Contract Times under the above contract will commence to run on
, 20 . By that date, you are to start performing your obligations under the
Contract Documents. In accordance with Article 4 of the Agreement, the dates of Substantial Completion
and Final Completion are and , respectively.
NOTICE OF AWARD
DATED:
TO:
(Bidder)
ADDRESS:
OWNER’S CONTRACT NO. :
PROJECT:
(Insert name of Contract as it appears in the Bidding Document)
You are notified that your Bid dated for the above Contract has been considered. You are
the apparent Successful Bidder and have been awarded a contract for
as advertised plus
addendums.
(Indicate total Work, alternatives or sections or Work awarded)
The Contract Price of your contract is
(S$ )