Finance Committee - Agenda - 3/6/2019 - P284
necessary, and the cost thereof shall be deducted from any compensation due, or which may become due, the
CONTRACTOR under its Contract.
4.02 Subsurface and Physical Conditions
A. Reports and Drawings:
1. Those reports of explorations and tests of subsurface conditions at or contiguous to the Site that ENGINEER has
used in preparing the Contract Documents; and