Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 10/7/2020 - P70

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P70

| oI

ENERGY EFFICIENT INVESTMENTS INC.

EEI recommends the replacement of existing efficient transformers in order to improve the energy
efficiency of the electrical distribution systems through the replacement of the transformers with
new high efficiency units. The scope of work for this measure would include upgrading:

32 Transformers

(5) ISKVA
(4) 30 kVA
(2) 45 kVA
(1) 75 kVA
(6) 112.5 kVA
(1) 145kVA
(1) 150kVA
(1) 175 kVA
(3) 220 kVA
(4) 225 kVA
(2) 300 kVA
(2) 500 kVA

Finance Committee - Agenda - 10/7/2020 - P69

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P69

| oI

ENERGY EFFICIENT INVESTMENTS INC.

EEI proposes installing a complete DDC system as an extension of the existing N4 Enterprise
Supervisor.

Scope of work:

Demo the existing VAV controllers, keeping the existing communication wiring operational for the
existing controllers. Install new BACnet IP DDC controllers, new space sensors, and new discharge air
sensors. Install network controller hardware and software updates as needed.

Finance Committee - Agenda - 10/7/2020 - P68

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P68

| oI

ENERGY EFFICIENT INVESTMENTS INC.

Nashua North High School

ECM 1- LED Lighting

The schools currently utilize a combination of T8 and TS fluorescent lighting. EEI proposes replacing the
existing fixtures with new LED lighting. EEI performed a detailed survey of the interior and exterior spaces
in order to identify opportunities in which we can improve lighting quality, reduce maintenance costs, and
save energy.

Finance Committee - Agenda - 10/7/2020 - P67

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P67

| oI

ENERGY EFFICIENT INVESTMENTS INC.

ECM: Nashua South High School

M&V Option Used

1. LED Lighting Option A
2. Controls Upgrade Option C
3. Weatherization Option C
4, Transformers Option B
5, Retro-Commissioning Option C
6. Mini Splits Option B
7, Condensing Hot Water Option A
8. Targeted Balancing Option A
9. Kitchen Hood Option B
10, Walk In Coolers Option B

Finance Committee - Agenda - 10/7/2020 - P66

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P66

ENERGY EFFICIENT INVESTMENTS INC.

| oI

Project Overview

1, PROJECT SUMMARY

The goal of this project is to achieve energy savings through upgrades to the buildings’
electrical, plumbing, mechanical, and building envelope. This project will result in improved
building performance, thereby reducing energy and maintenance costs.

School Address SF
Nashua North High School 8 Titan Way 420,000
Nashua South High School 36 Riverside St. 430,000

2. M&V OPTION SUMMARY

Finance Committee - Agenda - 10/7/2020 - P65

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P65

ENERGY EFFICIENT INVESTMENTS INC.

| oI

Introduction

This Measurement and Verification Plan has been prepared as a guide in determining the energy savings as a

result of the installed Energy Conservation Measures. In this document, EEI will show the baseline
calculations used to determine cost savings and how we can evaluate the installed measures to ensure the
Savings Guarantee is being satisfied.

Finance Committee - Agenda - 10/7/2020 - P64

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P64

| oI

ENERGY EFFICIENT INVESTMENTS INC.

Table of Contents

Finance Committee - Agenda - 10/7/2020 - P63

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P63

IKE]

ENERGY EFFICIENT INVESTMENTS ING.

Energy Efficient Investments, Inc.

Measurement and Verification
Annual Report
Period: 2016-2018 Baseline

For:

Nashua, NH School District

Prepared by:
EE], Inc.
Energy Advisors Group
Steve Tarantino, LEED AP O+M, EIT

Prepared on:

01/27/20

Finance Committee - Agenda - 10/7/2020 - P62

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P62

Attachment 4 - Measurement and Verification Plan

ESCO Contract — Nashua Schools & EEI, Inc 11/22/2019

Finance Committee - Agenda - 10/7/2020 - P61

By dnadmin on Mon, 11/07/2022 - 13:25
  • Read more about Finance Committee - Agenda - 10/7/2020 - P61

Attachment 3 - Project Cost

eR rita

Nashua North High School

Cost for Installed
Measure $

Pele er Mad
E

Pree B Corea

Annual Electric
Savings (kWh)

Annual Natural CO? Emmisions

Gas Savings
(Therm)

Reduction
facie)

PT emarsha tts la 4