Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Board Of Aldermen - Agenda - 9/28/2020 - P146

By dnadmin on Sun, 11/06/2022 - 23:00
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P146

@

Vanasse Hangen Brustlin, Inc.

public streets, but also include internal connections on and between building sites.

Board Of Aldermen - Agenda - 9/28/2020 - P145

By dnadmin on Sun, 11/06/2022 - 23:00
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P145

3/5/2013

\wnh-bed\projects\52700.00 Nashua Circulation Study\cad\ts\planset\ReportFigures.dgn

——
—>P-

Pine Street
Palm Street

Vane

Myrtle Streez

Central Street oon 4

<——

Ash Street

W, Hollis Street gm

Lae

Y

—_>

Vine Street
Chestnut Street ~<—

t
t Y

W, Pearl Street
eee ween ene
Cedar Street
<<

Pleasant Street

wl
oO
oO
—
s

® o o

2 8 £

o o uy

= <=

=

Board Of Aldermen - Agenda - 9/28/2020 - P144

By dnadmin on Sun, 11/06/2022 - 23:00
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P144

2/22/2013 \\nh-bed\projects\52700.00 Nashua Circulation Study\cad\ts\planset\ReportFigures.dgn

PEGOONOOC! (004
i
I

Figure 2

Broad Street Parkway

Concept Plan

Board Of Aldermen - Agenda - 9/28/2020 - P143

By dnadmin on Sun, 11/06/2022 - 23:00
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P143

@ Vanasse Hangen Brustlin, Inc.

Board Of Aldermen - Agenda - 9/28/2020 - P142

By dnadmin on Sun, 11/06/2022 - 23:00
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P142

@ Vanasse Hangen. Brustlin, Inc.

Existing Conditions

ES — eae
2.1 ~—_—‘ Introduction

Board Of Aldermen - Agenda - 9/28/2020 - P141

By dnadmin on Sun, 11/06/2022 - 23:00
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P141

3/5/2013 + \\nh-bed\projects\52700.00 Nashua Circulation Studyicad\ts\planset\ReportFigures.dgn
a Le. — ius s ;

TO
on ull

=| .
+
om

id
=
rw
=
=
8

te

Suit Stee

eu 1-S eal

At) ow

i 3 W. ae

> a

LEGEND
7 General Study Area Limits

—_—— Directional Traffic Flow Figure I

© Existing Traffic Signal Study Area
Future Traffic Signal

© (To be constructed by the

2 ee Broad Street Parkway Project)

600 Feet

Board Of Aldermen - Agenda - 9/28/2020 - P140

By dnadmin on Sun, 11/06/2022 - 23:00
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P140

@ Vanasse Hangen Brustlin, Inc.

Introduction

i eS}
1.1. Project Background

Board Of Aldermen - Agenda - 9/28/2020 - P139

By dnadmin on Sun, 11/06/2022 - 23:00
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P139

\whibipro)Bedtord\S2700,00 Nastia
Circulation StudyraportsFinal Report\Fina!
Fapon doc,

@ Vanasse Hangen Brustlin, Inc.

8

roadway width could accommodate two 10’ travel lanes in addition to
maintaining on-street parking on both sides of the roadway. This
modification to the sidewalk is estimated to cost approximately $20,000.

Board Of Aldermen - Agenda - 9/28/2020 - P138

By dnadmin on Sun, 11/06/2022 - 23:00
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P138

@ Vanasse Hangen Brustlin, Ic.

Concurrent Pedestrian Signal Phasing

Board Of Aldermen - Agenda - 9/28/2020 - P137

By dnadmin on Sun, 11/06/2022 - 23:00
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P137

\Whblprof\BedforchS2700 00 Nashua
Circulation Study\reports\Final RaportFinal
Report doce

@ Vanasse Hangen Brustlin, Inc.

6

Hollis Street/Spring Street traffic signal. Also, patrons of the Post Office would no
longer be able to queue along one of the travel lanes when the parking lot gets
congested (as they do today) as the northbound traffic would be limited to one lane.
Nevertheless, if the City is committed to begin to convert some of its one-way streets
to two-way, Spring Street may be a good location to start.

Pagination

  • Previous page ‹‹
  • Page 2522
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact