Finance Committee - Agenda - 3/17/2021 - P364

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P364

E. ENGINEER’s Cost Reimbursement: ENGINEER will record time required by ENGINEER and ENGINEER’s Consultants
in evaluating substitute proposed or submitted by CONTRACTOR pursuant to paragraphs 6.05.A.2 and 6.05.B and in
making changes in the Contract Documents (or in the provisions of any other direct contract with OWNER for work on
the Project) occasioned thereby. Whether or not ENGINEER approves a substitute item so proposed or submitted by
CONTRACTOR, CONTRACTOR shall reimburse OWNER for the charges of ENGINEER and ENGINEER’s Consultants for

Finance Committee - Agenda - 3/17/2021 - P363

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P363

b. CONTRACTOR certifies that: (i) there is no increase in cost to the OWNER; and (ii) it will conform
substantially, even with deviations, to the detailed requirements of the item named in the Contract
Documents.

2. Substitute Items

a. If in ENGINEER’s sole discretion an item of material or equipment proposed by CONTRACTOR does not
qualify as an “or-equal” item under paragraph 6.05.A.1, it will be considered a proposed substitute item.

Finance Committee - Agenda - 3/17/2021 - P362

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P362

6.03 Services, Materials, and Equipment

A. Unless otherwise specified in the General Requirements, CONTRACTOR shall provide and assume full responsibility
for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances,
fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals
necessary for the performance, testing, start-up, and completion of the Work.

Finance Committee - Agenda - 3/17/2021 - P361

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P361

the perils or causes of loss covered by such policies and any other property insurance applicable to the Work; and, in
addition, waive all such rights against Subcontractors, ENGINEER, ENGINEER’s Consultants, and all other individuals or
entities identified in the Supplementary Conditions to be listed as insured or additional insured (and the officers,
directors, partners, employees, agents, and other consultants and subcontractors of each and any of them) under such
policies for losses and damages so caused.

ARTICLE 6 - CONTRACTOR’S RESPONSIBILITIES

Finance Committee - Agenda - 3/17/2021 - P360

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P360

suspend the contract, or terminate the contract. CONTRACTOR further agrees, if applicable, as a precondition to the
performance of any work under this contract and as a precondition to any obligation of the OWNER to make any
payment under this contract to provide the OWNER with a certificate of a qualified insurer.

5.05 Property Insurance

A. CONTRACTOR must purchase and maintain property insurance upon the Work at the Site in the amount of the full
replacement cost of the Work. This insurance shall:

Finance Committee - Agenda - 3/17/2021 - P359

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P359

2. The CONTRACTOR must maintain the following lines of coverage and policy limits for the duration of the
contract. Any subcontractors used by the CONTRACTOR are subject to the same coverage and limits and is a
subcontractor of the CONTRACTOR and not the OWNER. It is the responsibility of the CONTRACTOR to update
Certificates of Insurance during the term of the contract. Provide coverage for not less than the following amounts
or greater:

General Liability
$1,000,000 per Occurrence
$2,000,000 Aggregate
City of Nashua Additional Insured

Finance Committee - Agenda - 3/17/2021 - P358

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P358

ARTICLE 5 - BONDS AND INSURANCE

5.01 Performance, Payment, and Other Bonds

Finance Committee - Agenda - 3/17/2021 - P357

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P357

2. Other data, interpretations, opinions and information contained in such reports or shown or indicated in such
drawings; or

3. Any CONTRACTOR interpretation of or conclusion drawn from any “technical data” or any such other data,
interpretations, opinions or information.

Finance Committee - Agenda - 3/17/2021 - P356

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P356

or to have anticipated. If OWNER and CONTRACTOR are unable to agree on entitlement to or on the amount or
extent, if any, of any such adjustment in Contract Price or Contract Times, OWNER or CONTRACTOR may make a
Claim therefore as provided in paragraph 10.05.

3. CONTRACTOR shall notify the following underground utility locating service at least three full working days prior
to beginning work: Dig Safe System, Inc. DIAL 811.

Finance Committee - Agenda - 3/17/2021 - P355

By dnadmin on Mon, 11/07/2022 - 13:45
  • Read more about Finance Committee - Agenda - 3/17/2021 - P355

Requirements or Contract Documents to be conducted by or for CONTRACTOR prior to CONTRACTOR’s making
such final commitment; or

c. CONTRACTOR failed to give the written notice within the time and as required by paragraph 4.03.A.