Finance Committee - Agenda - 2/1/2017 - P163

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P163

5.02 Licenses Sureties and Insurers

A. All Bonds and insurance required by the Contract Documents to be purchased and maintained by CONTRACTOR
shall be obtained from surety or insurance companies that are duly licensed or authorized in the jurisdiction in which
the Project is located to issue Bonds or insurance policies for the limits and coverage’s so required. Such surety and
insurance companies shall also meet such additional requirements and qualifications as may be provided in the
Supplementary Conditions.

Finance Committee - Agenda - 2/1/2017 - P162

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P162

E. CONTRACTOR shall not be required to resume Work in connection with such condition or in any affected area
until after OWNER has obtained any required permits related thereto and delivered to CONTRACTOR written notice:
(i) specifying that such condition and any affected area is or has been rendered safe for the resumption of Work; or (11)
specifying any special conditions under which such Work may be resumed safely. If OWNER and CONTRACTOR
cannot agree as to entitlement to or on the amount or extent, if any, of any adjustment in Contract Price or Contract

Finance Committee - Agenda - 2/1/2017 - P161

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P161

2. At points where the CONTRACTOR’s operations are adjacent to public and private utilities, CONTRACTOR
shall not commence work until CONTRACTOR has made all arrangements necessary for the protection of
utilities.

Finance Committee - Agenda - 2/1/2017 - P160

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P160

ENGINEER by the OWNER’s of such Underground Facilities, including OWNER, or by others. Unless it is otherwise
expressly provided in the Supplementary Conditions:

1. OWNER and ENGINEER shall not be responsible for the accuracy or completeness of any such information or
data; and

2. The cost of all of the following will be included in the Contract Price, and CONTRACTOR shall have full
responsibility for:

a. Reviewing and checking all such information and data,
b. Locating all Underground Facilities shown or indicated in the Contract Documents.

Finance Committee - Agenda - 2/1/2017 - P159

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P159

1. Is of such a nature as to establish that any “technical data” on which CONTRACTOR is entitled to rely as
provided in paragraph 4.02 is materially inaccurate; or

2. Is of such a nature as to require a change in the Contract Documents; or
3. Differs materially from that shown or indicated in the Contract Documents; or

Finance Committee - Agenda - 2/1/2017 - P158

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P158

F. CONTRACTOR shall be responsible for the damage or destruction of property of any character resulting from
neglect, misconduct, or omission in its manner or method of execution or the non-execution of the work, or caused by
defective work or the use of unsatisfactory materials, and such responsibility shall not be released until the work shall
have been completed and accepted and the requirements of the Construction Specifications complied with.

Finance Committee - Agenda - 2/1/2017 - P157

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P157

3.04 Amending and Supplementing Contract Documents

Finance Committee - Agenda - 2/1/2017 - P156

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P156

C. Clarifications and interpretations of the Contract Documents shall be issued by ENGINEER as provided in Article
9.

3.02 Reference Standards
A. Standards, Specifications, Codes, Laws, and Regulations

Finance Committee - Agenda - 2/1/2017 - P155

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P155

1. A preliminary progress schedule indicating the times (numbers of days or dates) for starting and completing the
various stages of the Work, including any Milestones specified in the Contract Documents;

2. A preliminary schedule of Shop Drawing and Sample submittals which will list each required submittal and the
times for submitting, reviewing, and processing such submittal; and

Finance Committee - Agenda - 2/1/2017 - P154

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P154

D. Furnish, Install, Perform, Provide

1. The word “furnish,” when used in connection with services, materials, or equipment, shall mean to supply and
deliver said services, materials, or equipment to the Site (or some other specified location) ready for use or
installation and in usable or operable condition.

2. The word “install,” when used in connection with services, materials, or equipment, shall mean to furnish and
install said services, materials, or equipment complete and ready for intended use.