Finance Committee - Agenda - 2/1/2017 - P223

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P223

SECTION 01320

SURVEY CONTROL

PART 1 - GENERAL

1.1 SURVEY REFERENCE POINTS

A.

OWNER has established survey control points around the Site for construction
horizontal and vertical control. OWNER shall provide survey control point
information to the CONTRACTOR once the contact is awarded.

Finance Committee - Agenda - 2/1/2017 - P222

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P222

Section 01310 - Project Coordination and Meetings Page 2 of 2

August 2016 3066.07
not conscientious, or not industrious, then CONTRACTOR shall replace the
supervisory representative upon written request of OWNER or ENGINEER.

D. CONTRACTOR shall only employ competent individuals on the job. Whenever

Finance Committee - Agenda - 2/1/2017 - P221

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P221

SECTION 01310

PROJECT COORDINATION AND MEETINGS

PART 1 - GENERAL

1.1

1.2

1.3

PRECONSTRUCTION CONFERENCE

A.

CONTRACTOR shall not commence Work until a preconstruction conference
with representatives of ENGINEER, and OWNER is held. This preconstruction
meeting will be arranged by OWNER and is intended to establish lines of
communication between the parties involved. The time and place of the
preconstruction meeting will be determined at least one week prior to the start
of Work.

PROGRESS MEETINGS

Finance Committee - Agenda - 2/1/2017 - P220

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P220

Section 01290 — Measurement and Payment Page 4 of 4
August 2016 3066.07

PART 2 - PRODUCTS
Not Used.
PART 3 - EXECUTION

Not Used.

[END OF SECTION 01290]

SANBORN ll HEAD

Finance Committee - Agenda - 2/1/2017 - P219

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P219

Section 01290 — Measurement and Payment Page 3 of 4

Finance Committee - Agenda - 2/1/2017 - P218

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P218

Section 01290 — Measurement and Payment Page 2 of 4

August 2016

3066.07

1.3

1.4

D.

Retainage will be with held as defined in the Bid Documents.

PARTIAL PAYMENTS:

A.

Partial payments shall be made as the work progresses. All partial invoices
and payments shall be subject to correction in the final quantity invoice and
payment.

Finance Committee - Agenda - 2/1/2017 - P217

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P217

SECTION 01290

MEASUREMENT AND PAYMENT

PART 1 - GENERAL

1.1 MEASUREMENT OF QUANTITIES

A.

B.

Measurements will not be obtained for lump sum items.

ENGINEER shall verify measurements for all unit price Contract items to
evaluate progress payment applications, and to confirm final quantities of
Work in place prior to the final payment of the Contract based upon digital
Record Drawing provided by CONTRACTOR.

Finance Committee - Agenda - 2/1/2017 - P216

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P216

Section 01110 - Summary of Work Page 2 of 2

August 2016

B.

3066.07

Existing GCCS features are located throughout the site. CONTRACTOR shall
locate and protect the existing GCCS features against damage. Damaged
features shall be repaired or replaced to the satisfaction of ENGINEER and
OWNER at CONTRACTOR’s expense.

Construction activities at the site must be performed during daylight hours
between 7:00 am and 4:00 pm Monday through Friday.

14 WORK PERFORMED UNDER SEPARATE CONTRACTS

A.

Finance Committee - Agenda - 2/1/2017 - P215

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P215

SECTION 01110

SUMMARY OF WORK

PART 1 - GENERAL

11 ITEMS OF WORK

A.

The major items of Work associated with the construction of the landfill gas
collection and control system (GCCS) include, but are not limited to the

following:

1. Providing construction layout and documentation survey.

2. Excavating and backfilling trenches and relocating waste associated with
excavations to the active landfill as directed by OWNER.

3. Furnishing materials for and constructing gas collection trenches.

Finance Committee - Agenda - 2/1/2017 - P214

By dnadmin on Mon, 11/07/2022 - 10:28
  • Read more about Finance Committee - Agenda - 2/1/2017 - P214

CONTENTS

DIVISION 1 - GENERAL REQUIREMENTS

Section 01110 - Summary of Work

Section 01290 - Measurement and Payment

Section 01310 - Project Coordination and Meetings

Section 01320 - Survey Control

Section 01330 - Submittals

Section 01450 - Quality Control

Section 01520 - Construction Facilities and Temporary Controls
Section 01780 - Project Record Documents