Harvey Construction Spreadsheet Report Page 72
: Nashua PAC GMP PostBid VE 10/21/2020 3:45 AM
312306 Excavation and
Elevator Pit Excavation & Backfill al 9,192.00 fea
Service Elevator Incl. VE-9
320000 EXTERIOR IMPROVEMENTS
321200
321400 Unit
Remove, Salvage, Deliver for Re-instail 1,810.00 sf A 10.00 isf
Existing Srick Unit Pavers at Sidewalks &
Replacement of damaged Brick Unit
Pavers at Sidewaiks & ALLOWANCE
10.00 fsf
323100
Chain Link Fence & Gates at Dumpster & 15,000.00 fis
7
330000 UTILITIES
Water Utilities
Estimate Totals
aber 372,741 hres 2.757 ist 0.99%
Material ; : 3.628 Jaf 4.34%
Subcontract 13,173,939 231422 fsf 83.26%,
Equipment 160.000 hrs.
Other