Document Date
Meeting Description
Document Type
Meeting Date
Page Number
70
Harvey Construction
Wire Mesh Partiions (200 1f & Doors (2
ez.)
Toilet Accessories
: Toilet Accessories
‘EQUIPMENT
&
Support work for Stage Rigging &
Div.
FURNISHINGS
Blinds & Shades (B9 ea) Manual rover
shades with 1% or 3%
CONVEYING SYS
Elevators
EL-B 5-Stop Service - Gearless Traction 1.09 Is
Elevator 4500 LB
ELEV-1 Clevator Operator Time (1.5 12,00 mh
ELEV-2 Decommission existing Elevator 8.00 ea
Spreadsheet Report
Nashua PAC GMP Postfid VE
23,962.00
11,578.06
10,357.00
23,962) NEPI
16,351| DWC
Schindler
Schindler
Page 9
10/29/2020 8:45 AM
23,962.00 As
17,578.00 fs
3,000.00 /s
10,351.00 js
164,200.00 tts 784,800
491.00 /mh 2,292
lea 5,000
Page Image
