Spreadsheet Report Page 5
Nashua PAC GMP PostBid VE 10/24/2020 8:45 AM
Harvey Gonstuction
Masonry (Includes rebar & cavily wail
Granite
Granite Sills w/Thermal finish - Ramps,
& deleted by VE13
Veneers
Clean Brick & Granite
Mise. lafill Alewaree
‘Thin-Brick (in liew of Swisspeari
METALS
Structural Steel
Structural Steel Colurnns, Beams, Joist,
& Ind. VE-8, VE.10
Police Detail on Main St. durng Steal &
No
Cut Deck
Insulative Coating on steel outsice thermal
nemic)
Metals Sub
Metals Not Shown - Alowance
& PLASTIC
Infill Wood Framed
Infill floor - Materials
Infill floor ~ Labor & Equipment
Infill calling Framing not shown on Plans -
Labor
Temp. Brace exist, 4-story structure at all
floor to Steel erection
Open & Close Roof Openings for Stee!
erection at
Common Staging In Audience Chamber
Misc.
0.00
400.00
3,741.00
1.00
1.00
4.00
4.00
4.00
1.00
4,800.00 sf
Northeast
Northeast
Northeast
Allowanta
Northeast
40,000.00
38,008
221,050.00 Js
44,750.00 taf
1,395,006.00 As
855.44 days
fis
5,000.00 fis
475,000.00 ds
16,000.00 ils
55,000.00 ils
162,600.00 fis
92,500.00 fis
30,000.60 Js
40,000.90 fs
221,050
1,395,000