Harvey Construction
GENERAL CONDITIONS
P Dimensions
General Conditions
GENERAL REQUIREMENTS
T
at Main St. Sidewalk
EXISTING CONDITIONS
Demolition
TJakedowa + 2
Selective Demolition 4-Story Bldg
Completed Exploratery Demolition inv
Police Details on Main St. during
Asbestos Removal
Asbestos Removal
Concealed Asbesios Removal - Allowance
&
2-Story Foundation Wall Shores at A-Ln,
41-Ln & N-Ln. (prier to Bldg T:
Underpinning Allgwance
CONCRETE
Foundation Sub
Foundation Sub (Column Pigs, Loading
Dock Pigs & Walls) - Incl VE-9, VE~10
Flatwork Sub
Flatwork Sub includes #9 purnps Incl.
VE-10
Pads
Barrier
Stego Tape 4", (180 per rall, avg, 2 to 3.
Concrete Sealer
Goncrete Seelar - Ashford Formula
Concrete
ConcADoO0
Fdn Wail Concrete
for foundations
* 4,00 Js
1.00 Is
1.00 Is
16.00 day
304.00 ay
40,286.00 sf
af
27.08 rall
Spreadsheet Report
Nashua PAC GMP PostBid VE
27,359.00 27, Associated
147 NH Bema
110,630: NH Demo
Ex =e
26,166:
8,332
198, Premier
48,199.00; 48,109) Kaloutas
Page 3
TO/24/2020 8:45 AM
27,359.00 As 27,358
147,500.00 JIs. 141,500
110,530.00 /is 410,630
oy
26,166.00 is 26,166
555.44 day 8,332
36,525.00 its
70,000.00 fis
40,000.00 As
50,000.00 js
$61.01 joy
4.84 JIsf
35.00 frou
18,106.00 is
18.89 icy