Telcom — As Prepared by ICON Architects
T-001
T+104
T-102
T-103
7-104
T-105
T-201
T-301
Telecom Legend, Notes & Abbreviations
Basement Floor Telecom Plan
Ground Floor Telecom Plan
Parterre Floor Telecom Plan
Third Floor Telecom Plan
Fourth Floor Tefecom Plan
Telecom Riser Diagram
Telecom Details & Schedules
Theatrical LightIng — As Prepared by ICON Architects
oo * 2 @ 68 8 ©
ETL-110
ETL-120
ETL-130
ETL-137
ETL-140
ETL-150
ETL-160
ETL«170
ETL-180
Theatrical Lighting Functional Diagram
Theatrical Lighting Longitudinal Section
Theatrical Lighting Outlet Device Details
Theatrical Lighting Outlet Device Details
Theatrical Lighting Control Device Details
Theatrical Lighting House Control Device Details
Theatrical Lighting Equipment Rack Details
Theatrical Lighting Relay Panel Details
Theatrical Lighting Relay Panel Schedules
Rigging — As Prepared by ICON Architects
a
*# # 6 #
R-101
R-102
R-201
R-202
R-301
Theatre Rigging Stage Plan
Theatre Rigging Plans
Theatre Rigging Center Line Section
Theatre Rigging Elevations
Theatre Rigging Elevations
Telescophg Seating — As Prepared by ICON Architects
Project Specifications
DIVISION 01 - GENERAL REQUIREMENTS
TS-100
TS-101
TS-102
TS-103
TS-100
Main Level Seating Plan
Balcony Level Seating Pian
Seating Section
Seating Section
Seating Section
011000 - Summary
012300 — Alternates
014110 — Special inspections & Testing
014110a — Statement of Special Inspections
016200 -- Substitution Request Form
017419 - Construction Waste Management
DIVISION 02 — EXISTING CONDITIONS
021210- Environmental Controls
024100 — Demolition
024113 — Selective Site Demolition
DIVISION 03 — CONCRETE
033006 — Cast-in-Place Concrete
033300 — Architectural Concrete
033515 — Concrete Finishing
034150- Precast Prestressed Concrete Planks
- 8/14/2620
8/14/2020
8/14/2020
8/14/2020
8/14/2020
8/14/2020
8/14/2020
8/14/2020
8/14/2020
8/14/2020
8/14/2020
8/14/2020
8/14/2020
8/14/2020
8/14/2020
8/14/2020
8/14/2020
8/14/2020
8/14/2020
8/14/2020
8/14/2020
8/14/2020
8/14/2020
8/14/2020
8/14/2020
8/14/2020
8/14/2020
