HVAC Replacement Project
All equipment controlling the Pistol Range is original to the
1977 building, in poor condition and beyond it’s useful life.
Range officers have recently been blood tested and showed
high lead levels due to the systems inefficiencies
The Fleet Maintenance Garage System is also all original to
the 1977 building. It is in poor condition and beyond it’s
useful life
The Variable Air Volume System is original to the 1999
addition
There are two main hot water pumps supplying hot water to
the addition and operate on a lead/standby fashion. One of
those pumps is not operating due to a faulty isolation valve
leaving the building with no backup system
Many of the components of this system are currently
working but are charged with R22 and will not be able to be
repaired if they fail