Document Date
Meeting Description
Document Type
Meeting Date
Page Number
8
Window Replacement Project
Original portion of building built in 1979
There are 47 original windows in building
Many are failing causing ingress of weather
and energy losses
A bid (IFB1075-010319)was obtained from D.L.
King in the amount of $134,500 to replace the
47 failing windows
These windows will be the same as the
windows installed in 1999
Page Image
