Nashua Solar Projects Overview
1. Maximum Value Locations Install Type kW (DC) kWh/Year Load Offset
Garage - Streets Roof-ballasted 398.9 466,420 181%
Office - Public Works Roof-flush 141.4 151,190 70%
Garage - Transit Roof-ballasted 128.0 133,300 144%
Fire Station - 177 Lake St Roof-flush 125.8 130,314 81%
Wastewater Treatment Plant Roofs-ballasted (3) 86.6 98,495 2% (100%)
Total: 880.7 979,719 18% (119%)
2. Maximum Visibility Locations
Performing Arts Roof-ballasted 36.3 42,785 28%
City Hall Roof-ballasted 29.6 33,468 6%
Fire Station - Amherst St Roof-flush 18.2 19,971 19%
Public Health Office Roof-ballasted 17.4 20,011 19%
Transportation Terminal Roof-flush 11.2 13,645 45%
Total: 112.7 129,880 13%
(Q) REVISION ENERGY