Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 10/22/2019 - P5

Board Of Aldermen - Agenda - 10/22/2019 - P5

By dnadmin on Sun, 11/06/2022 - 22:34
Document Date
Fri, 10/18/2019 - 16:44
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 10/22/2019 - 00:00
Page Number
5
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__102220…

Conceptual Design Overview

Following are descriptions of the various project components as they are currently understood and the
below map provides a key to each of the primary numbered project components.

1 - New Access at Factory St. Extension:

Task: Define the accessible route from Clock Tower Place to Factory Street Extension. This may require
ramps and/or creative use of the available space to satisfy ADA requirements.

Product: Plans, Profiles, Section as appropriate to define the proposed improvements and to illustrate
proposed grading.

2 - Existing ADA Ramp and Cotton Transfer Pedestrian Bridge:

Task: The project includes no significant changes to the existing south side ramp and ped bridge.
Elements that may be included in this existing project facility include lighting and signage. Lumen
Design Studio has already included the Cotton Transfer Bridge in their existing contract with the City and
minimal additional effort is required during Phase 1 of this project.

3 - Redesign of Factory St Extension:
This area will include modifications to the existing Factory St Extension to better accommodate
pedestrians and bicyclists, but to continue to provide access for emergency vehicles and maintenance

Page Image
Board Of Aldermen - Agenda - 10/22/2019 - P5

Footer menu

  • Contact