Board Of Aldermen - Minutes - 12/16/2019 - P75

By dnadmin on Sun, 11/06/2022 - 22:31
Document Date
Mon, 12/16/2019 - 00:00
Meeting Description
Board Of Aldermen
Document Type
Minutes
Meeting Date
Mon, 12/16/2019 - 00:00
Page Number
75
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_m__121620…

> p

> p

Will lockers be replaced?
Yes, this is currently included in the scope.

Folding partitions are useful but are in disrepair. Will they be replaced?

Yes, cost of replacement is currently included in the scope of the project. Final direction on
replacement versus creating permanent walls will be made with user groups during the
detailed design phase.

NEW MIDDLE SCHOOL

Q.

A.

> p

> p

> p

> p

Will the stage location be located adjacent to the Gym? Conflicts with after-school event
schedules may take place.

During the Phase 1 process, a concept design was created to account for spaces, and the
general locations of those spaces are used to determine the approximate size and shape
of the building. During the next phase of the project, a further detailed design will provide
refinement of the plan with more in depth feedback from user groups. The final design will
consider the pros and cons of placing the stage adjacent to the gym or cafeteria.
Ultimately the School District, the Board of Education and the school staff will help
determine any stage locations.

Will OT/PT be located far from SPED?

During the Phase 1 process, a concept design was created to account for spaces, and the
general locations of those spaces are used to determine the approximate size and shape
of the building. During the next phase of the project, a further detailed design will provide
refinement of the plan with more in depth feedback from user groups.

Will there be a traffic light at the intersection of Main Dunstable and Buckmeadow?

This would be decided by the Department of Public Works and the City Engineer. In order
for a traffic light or other traffic calming features to be introduced they must meet the
guidelines that exist for public roads. Final road changes will be addressed and
introduced by the City of Nashua’s Department of Public Works.

Has a traffic study been completed?
A tl raffic Engineer has done a traffic study at all middle school sites and has reviewed
impacts of the projects to the surrounding streets as well as projected trip generations.

Will Guidance, Social Worker, and Psychology be located as shown?

During the Phase 1 process, a concept design was created to account for spaces, and the
general locations of those spaces are used to determine the approximate size and shape
of the building. During the next phase of the project, a further detailed design will provide
refinement of the plan with more in depth feedback from user groups.