Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 5/24/2016 - P24

Board Of Aldermen - Agenda - 5/24/2016 - P24

By dnadmin on Sun, 11/06/2022 - 21:35
Document Date
Tue, 05/24/2016 - 00:00
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 05/24/2016 - 00:00
Page Number
24
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__052420…

41,

42.

43.

44,

45,

46.

Do you want gray colored heads?
a. Yes, all fixtures should be gray in color unless decorative. Decorative fixtures should be

direct replacements in color (generally black).

Can the City please clarify if it requires product technical specification sheets for the products
proposed?
a. Yes the City requires all technical sheets (cut sheets) for the products proposed. These
sheets should include all detailed information relative to the proposed fixtures (System
Watts, kWs, typical lumens delivered, LED Current, Efficacy, warranty, finish, wattage
switch if applicable, driver & dimming, voltage, part/manufacturer’s numbers, etc.).

Can the City please clarify if in Section 5 on Page 6, the Entity shall supply and install 10, 3000K
LED products as samples per each type of fixture "style" options (see Section 4.3) for a total of

20 samples or just 10 samples?
a. The Trial period does not require multiple fixture “style” options. The ten (10) Trial
Period fixtures should be the cobra head style fixtures that are being proposed.

Can the City please clarify/describe the inventory in more detail? Pricing for cobra head fixtures

vs. decorative fixture vs shoe box fixtures can vary substantially.
a. Please see “SCHEDULE C, EVERSOURCE STREET LIGHT LEDGER.” This is the most detailed

inventory the City has regarding specific fixture types.

Can the City please provide clarity on the "ADDITIONAL PROJECT UNIT PRICES” section? The
instructions clearly state "fill out the yellow highlighted areas", but do not indicate if other areas

should be left to the city (or contractor) to complete.
a. The Contractor should fill out “ADDITIONAL PROJECT UNIT PRICES.” This has been

updated with yellow highlighting for consistency and clarification.

{Item's 1 & 2 of "GENERAL NOTES" directly contradict themselves. Please clarify if the City wants

retrofit kits or does NOT want retrofit kits.
a. The City does not want retrofit kits. This has been corrected on the General Notes on

“Schedule B, COST PROPOSAL SHEET TEMPLATE.”

RFPO6O9-031116 Addendum 1- City of Nashua LED Street Lighting Conversion Project Page 6 of 6

229 Main Street « Nashua, New Hampshire 03060 © Phone (603) 589-3330 © Fax (603) 589-3344

Page Image
Board Of Aldermen - Agenda - 5/24/2016 - P24

Footer menu

  • Contact