AMENDED
ORDINANCE O-18-012
(g) Kitchen exhaust systems:
[1] Hoods (each): $3375.
[2] Fans associated with hoods — replacement (each): $359010.
(h) Minimum fee for miscellaneous equipment (each), excluding the
application fee, where not otherwise provided for by this section: $3335.
(i) Re-inspection of the same work due to the failure to pass an initial
inspection or the unavailability of the premises at the time of initial
inspection: $5975.
(j) Surcharge for permits issued after construction started without a permit:
100% of applicable fee, but not to exceed $259500.
C. Electrical permit fee schedule.
(1) Residential electricalinehidine multtfamily (1 & 2 Family and Townhouses).
(a)
Nonrefundable application processing fee: $2530.
Note: If the items in Subsection C(2) through (6) are included with any other
work listed in those sections, there is no additional fee. (Example: if doing new
construction, there is no charge for the house meter.) The higher price will
prevail.
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
New construction, additions, renovations (per square feet of habitable
area): $0.06575.
[1] Service entrance (new dwelling only): $245030.
House meter: $4450.
Service change:
[1] Up to three two units: $4450.
[2] Each additional unit: $910.
Adding subpanel(s) (each): $4925.
Adding or relocating meter(s): $4450.
Pools (in-ground): $4450.
Temporary service (each): $38-5045.
Minimum fee for miscellaneous equipment (each), excluding the
application fee, where not otherwise provided for by this section: $3335.