AMENDED
ORDINANCE
O-18-012
(12) Re-inspection of the same work due to the failure to pass an initial inspection or
the unavailability of the premises at the time of initial inspection: $3075.
(13) Phased construction (foundation permits, interior demolition permits or shell
Pp
permits): Phased construction shall be charged a 25% surcharge on the original
permit fee for each upgrade phase.
(14) Surcharge for permits issued after construction started without a permit: 100% of
applicable fee, but not to exceed $250$275 Residential / $500 Commercial.
(15) Expedite-service fee for special processing and after-hours service: $75 per hour
per staff member, with a minimum of $459200 (4we-heurs) for weekends or time
not contiguous with normal work hours.
B. Mechanical permit fee schedule.
(1) Residential mechanicalneludine multfamily (1 & 2 Family and Townhouses).
(a)
(b)
(c)
(d)
Nonrefundable application processing fee: $2530.
Delivery system:
[1]
[2]
[3]
Gas supply piping (base fee downstream of meter or regulator set;
test witnessed) (each): $49— 0-99k BTU - $25; 100-199k BTU -
$40; 200k BTU and above - $50 plus $0.22 per 1,000 BTU.
Gas supply outlets (each branch): $3396.50.
Installation of Fuel oil storage tanks less than 499 gallons, fuel oil
(each): $6-5015.
Equipment:
[1]
[2]
43]
Bi4l
4415]
Pie]
to1Z]
FAILS]
£8419]
Furnace: $3850940.
Water Heater: $15.
Refrigeration system piping, coil, or condensing unit: $6-5015.
Boiler, water or steam: $38-5040.
Boiler, water or steam, with domestic hot-water generator: $4445.
Burner, conversion or replacement, oil or gas: $6-3015.
Heater, vented or unvented, floor, wall, room or gas log (each):
$650925.
Dryer, exhaust or ventilation fan er-baseboardteep(each): $36.
Baseboard loop (each): $10.
Wood or pellet stove and associated chimney: $4940.